Territory and Preferred Engineer Planning (tsspc4100m000)

Use this session to plan and maintain territory and preferred engineer.

Field Information

Territory Planning

The unique ID of the territory planning.

Description

The description or name of the code.

Employee Calendar Date From

The date from which you can calculate the capacity from the employee calendar of the available capacity.

Employee Calendar Date To

The date up to which you can calculate the capacity from the employee calendar of the available capacity.

Number of Visits

The average number of visits the service engineer can perform in a day for this territory planning.

Note: This information is required to calculate the travel time.
Unit

The unit in which the number of visits is expressed.

Created by

The ID of the user who creates the territory planning.

Description

The description or name of the code.

Creation Date

The date/time when the territory planning is created.

Last Modified by

The ID of the user who last modified the territory planning.

Description

The description or name of the code.

Last Modification Date

The date/time when the territory planning was last modified.

Capacity Allocations Calculated On

The date and time when the last capacity allocation was calculated.

Text

If this check box is selected, a text is present.