Group for Work Orders (tsspc3600m100)
Use this session to view data of a specific work order group and an overview of all related data.
The tabs refer to the following sessions:
- Activity Sets: Activity Set - Lines for Work Orders (tsspc3610m100) session.
- Activities: Work Order - Lines (tswcs2100m100) session.
- Proposed Resources: Proposed Resources (tsspc3604m300) session.
- Resources: Group Planning Group – Resources (tsspc3102m000) session.
- Attribute Values: Group Planning Group – Attribute Values (tsspc3101m000) session.
- Set - Attributes Values: Activity Sets - Attributes Values (tsspc3111m000) session.
- Skills:
- Message Log: Message Log (tcstl1500m000) session.
Field Information
- Group
-
The unique ID of the group.
- Frozen
-
If this check box is selected, the group is frozen and you cannot add new groups to the existing groups.
- Firm Planned
-
If this check box is selected, the group is firm planned and you cannot change the start and finish date of the group.
- Keep Sequence of Activity Sets
-
If this check box is selected, LN does not change the sequence of the activity sets when the specified group is planned.
- Sort Method
-
The sorting method for work order activities in an activity set.
Allowed values
- Earliest Start
- Latest Finish
- Latest Start
- Planned Start
- Planned Finish
- Allocated Resource
-
The resources assigned to the specified group. Assigned resources are copied from group planning to the service order activity, work order activity or planned activity.
- Check Resources for Skills
-
If this check box is selected, LN allocates resources for work orders, based on skills.
- Check Resources for Attribute Values
-
If this check box is selected, LN allocates resources for work orders based on attribute values.
- Check Resources for Availability
-
If this check box is selected, LN checks availability of resources for work order.
- Minimum Availability Percentage
-
The minimum availability percentage of the resource for the allocation.
- Planned Start Time
-
The start date and time of the first activity set in the specified group.
- Planned Finish Time
-
The finish date and time of the last activity set in the specified group.
- Plan Method
-
The method to plan the work order activities.
Allowed values
- Planning Based on Time
- Planning Based on Route
- Respect Earliest Start Time
-
If this check box is selected, LN considers the earliest start time to plan the work order activities.
Note: For a work order activity, the planned start time must not be planned after the earliest start time. - Respect Latest Finish Time
-
If this check box is selected, LN considers the latest finish time to plan the work order activities. The Planned Finish Time cannot be planned after the Latest Finish Time. The work order activity is not planned.
Note: LN re-plans the route for the activity. - Respect Material Availability Date
-
If this check box is selected, LN considers the Material Availability Date specified for the work orders in the Resource Planning Parameters (tsspc0101m000) session, to schedule the work order activities in a Group.
Note:- This field is visible only if the Check Material Availability check box in the Service Order Parameters (tssoc0100m000) session or the Check Material Availability check box in the Work Order Parameters (tswcs0100m000) session is selected.
- This field is disabled if the Firm Planned check box is selected.