Groups for Projects for Dashboard (tsspc3500m300)

Use this session to view the group for projects to be used in Groups for Projects - Dashboard (tsspc3600m600) session.

Field Information

Start Date

The start date and time of the activities.

End Date

The finish date and time of the activities.

Allocated Resource

The resources assigned to the specified group.

Group

The unique ID of the group.

Allocated Resource

The resources assigned to the specified group.

Frozen

If this check box is selected, the activity set is frozen and you cannot add new activities to the existing activity set.

Firm Planned

If this check box is selected, the activity is firm planned and you cannot change the start and finish date of the activity.

Planned Start Time

The start date and time of the group planning activity.

Planned Finish Time

The finish date and time of the group planning activity.

Sort Method

The sorting method for project activities in an activity set.

Allowed values

Earliest Start
Latest Finish
Latest Start
Planned Start
Planned Finish
Plan Method

The method to plan the project activities.

Allowed values

Planning Based on Time
Planning Based on Route
Start Address of Route

The address of the starting point of the route.

Allowed values

Not Applicable
At First Activity
At Company Address
At Department Address
At Employee Home Address
Note: This field is enabled only if the Plan Method field is set to Planning Based on Route.
Start Travelling on Start Time

If this check box is selected, the engineer must start travelling to the location where the activity must be performed, at the Planned Start Time specified for a project. If this check box is cleared, the engineer must reach the location early and start working on the activity at the specified Planned Start Time.

Note: This field is enabled only if the Plan Method set to Planning Based on Route.
Average Travel Speed

The average travel speed used to calculate travel time when planning a route.

Note: This field is enabled only if the Plan Method field is set to Planning Based on Route.
Travel Offset Time

The time used to calculate travel time when planning a route.

Note: This field is applicable only if Plan Method is set to Planning Based on Route.
Keep Sequence of Activity Sets

If this check box is selected, LN does not change the sequence of the activity sets when the specified group is planned.

Note: This value is defaulted from the Group Sets for Projects (tsspc2190m300) if the Workload Leveling Method is set to Scheduling and the Plan Method is set to Planning Based on Route in the Group Sets for Projects (tsspc2190m300) session.
Respect Earliest Start Time

If this check box is selected, LN considers the earliest start time to plan the project activities.

Note: 
  • The planned start time must not be planned after the earliest start time.
  • This value is defaulted from the Group Sets for Projects (tsspc2190m300) session, if group is part of a group set.
Respect Latest Finish Time

If this check box is selected, LN considers the latest finish time to plan the planned activities. The Planned Finish Time cannot be planned after the Latest Finish Time.

Total Activity Duration

The cumulative duration of activities for all the activity sets in the group.

Total Travel Duration

The cumulative duration of travel for all the activity sets in the group.

Total Travel Distance

The cumulative travel distance of all the activity sets in the group.