View Group Planning Planboard (tsspc3261m000)

Use this session to select the data that is displayed in the Group Planning Planboard (tsspc3260m000) session.

Field Information

Selection Range

Use the fields in Selection Range to specify the range of data for which the Gantt Chart is displayed.

1

The From and To fields define a range of: the activity origin.

Allowed values

Service Order
Work Order
Planned Activity
Project
Non-Conformance Report
Corrective Action Plan
Job Shop Order
Project (PCS)
Note: 
  • This field is enabled only if the Use Assignments in Work Orders check box in the Work Order Parameters (tswcs0100m000) session and the Use Assignments check box in the Project Planning Parameters (tppss0100s000) session, are selected.
  • If the activity origin 1 field is set to Planned Activity, then the activity origin 2 field is disabled.
Group

The From and To fields define a range of: groups that must be merged.

Allocated Employee

The From and To fields define a range of: engineers allocated to the group.

Allocated Department

The From and To fields define a range of: departments allocated to the group.

Planned Start Time

The From and To fields define a range of: the planned start time of the activities that must be displayed.

Planned Finish Time

The From and To fields define a range of: the planned finish time of the activities that must be displayed.

Options
Read Only

If this check box is selected, LN starts the Group Planning Planboard (tsspc3260m000) session in display mode. You cannot specify or modify the data.

Grid Size

The time frame (step size in minutes) used to plan/move operations. If you are replanning operations in the graphical planning board, you can define the step size (in minutes) to drag and drop an operation. For example, if the Grid Size field is 30 minutes, you can move an operation with steps of 30 minutes. The start time of your operation can then be 12.30, 13.00, 13.30, and so on.

Note: If your grid size is 1 or 2 minutes, and you increase it, for example, to 15 or 30 minutes, the sensitivity of the planning board is decreased. A larger step size prevents you from accidently moving an operation by only touching the operation with the mouse.
Color Group

The code of the chart color group. The colors defined in this group are used in the Gantt chart to indicate legends.

Description

The description or name of the code.