Groups for Quality (tsspc3100m500)

Use this session to view and modify the group planning data for Non-Conformance Report and Corrective Action Plan.

Note: 
  • The Plan Groups and Activity Sets option is displayed, only if the Planned by Origin check box for the non-conformance or the corrective action plan is cleared on the Quality tab in the Resource Planning Parameters (tsspc0101m000) session.
  • This session is displayed in:
    • The Groups for Quality - Resource Requirements (tsspc3604m902) session.
    • The Groups for Quality - Proposed Resources (tsspc3604m903) session.

Field Information

Start Date Groups

The start date of the group. LN displays the details of the groups with a start date later than the specified date.

Finish Date Groups

The finish date of the group. LN displays the details of the groups with a finish date earlier than the specified date.

Allocated Engineer

The code of the allocated service engineer based on which the group data is filtered.

Group Set

The unique ID of the group set for which the attribute values are specified.

Group

The unique ID of the group.

Activity Origin

The origin of the activity.

Allowed values

Service Order
Work Order
Planned Activity
Project
Non-Conformance Report
Corrective Action Plan
Job Shop Order
Project (PCS)
Check Resources for Attribute Values

If this check box is selected, LN allocates resources for the Non-Conformance Report and Corrective Action Plan based on the attribute values.

Check Resources for Skills

If this check box is selected, LN allocates resources for the Non-Conformance Report and Corrective Action Plan based on the skills.

Check Resources for Availability

If this check box is selected, LN checks the availability of resources for the Non-Conformance Report and Corrective Action Plan.

Minimum Availability Percentage

The minimum availability percentage of the resource for the allocation.

Group Status

The least possible status of all the activities in the group.

Allowed values

Created

The activity is imported from service order activity, work order activity or planned activity. The activity is yet to be planned.

Planned

The activity is successfully planned (planning times are updated). The updated start and finish times can be copied to the service order activity, work order activity or planned activity.

Not Planned

The activity could not be planned. Owing to failure of the planning process, the activity must be re-planned.

Released

The updated start and finish times of the activity are copied to the service order activity, work order activity or planned activity.

Maximum NCR/CAP Status

The highest possible status of all the activities in the group.

Frozen

If this check box is selected, the group is frozen and you cannot add new groups to the existing groups.

Firm Planned

If this check box is selected, the group is firm planned and you cannot modify the start and finish date of the group.

Sort Method

The sorting method for the Non-Conformance Report and Corrective Action Plan activities in an activity set.

Allowed values

Earliest Start
Latest Finish
Latest Start
Planned Start
Planned Finish
Keep Sequence of Activity Sets

If this check box is selected, LN does not change the sequence of the activity sets when the specified group is planned.

Planned Start Time

The planned start date and time of the first activity set in the specified group.

Planned Finish Time

The planned finish date and time of the last activity set in the specified group.

Plan Method

The method to plan the Non-Conformance Report and Corrective Action Plan activities.

Allowed values

Planning Based on Time
Planning Based on Route
Total Activity Duration

The cumulative duration of activities for all the activity sets in the group.

Allocated Engineer

The engineer allocated to the specified group.