Group Sets for Work Orders (tsspc2190m100)
Use this session to view and maintain group sets generated from group planning activity sets for work orders.
Field Information
- Start Date Groups
-
The start date of the group set. LN displays the group sets with a start date later than the specified date.
- Finish Date Groups
-
The finish date of the group set. LN displays the group set with a finish date earlier than the specified date.
- Group Set
-
The unique ID of the group set.
- Activity Origin
-
The origin of the activities in the group sets for work order. By default, the value is set to Work Order.
Allowed values
- Service Order
- Work Order
- Planned Activity
- Project
- Non-Conformance Report
- Corrective Action Plan
- Job Shop Order
- Project (PCS)
- Target Number of Groups
-
The number of groups you create for the group set.
Note: The value in this field is defaulted from the Attribute Group - Preferred Resources (tsspc0120m100) session. - Existing Number of Groups
-
The number of groups available for the group set.
- Sort Method
-
The method to sort the work order activities in a group set.
Note: This value is defaulted from the Service Planning Parameters (tsspc0100m000) session.Allowed values
- Earliest Start
- Latest Finish
- Latest Start
- Planned Start
- Planned Finish
- Plan Method
-
The method to plan the work order activities in a group set.
Note: This field is enabled only if the Activity Origin is set to Service Order or Planned Activity.Allowed values
- Planning Based on Time
- Planning Based on Route
- Respect Earliest Start Time
-
If this check box is selected, LN considers the earliest start time to plan the work order activity.
Note: The value in this field is defaulted from the Respect Earliest Start Time field defined in the Resource Planning Parameters (tsspc0101m000) session. - Respect Material Availability Date
-
If this check box is selected, LN considers the Material Availability Date specified for the work orders in the Resource Planning Parameters (tsspc0101m000) session, to schedule the work order activities in a Group Set.
Note:- This field is visible only if the Check Material Availability check box in the Service Order Parameters (tssoc0100m000) session or the Check Material Availability check box in the Work Order Parameters (tswcs0100m000) session is selected.
- Planned Start Time
-
The planned start date and time of the first activity in the specified group set.
Note: The value in this field is defaulted from the groups (defined in Groups for Work Orders (tsspc3100m100) session) linked to the group set. - Planned Finish Time
-
The planned finish date and time of the last activity in the specified group set.
Note: The value in this field is defaulted from the groups (defined in Groups for Work Orders (tsspc3100m100) session) linked to the group set. - Total Activity Duration
-
The cumulative duration of travel for all the activities in the group set.
Note: The value in this field is defaulted from the groups (defined in Groups for Work Orders (tsspc3100m100) session) linked to the group set.