Planned Activity - Subassemblies (tsspc2150m000)

Use this session to create and maintain subassemblies for a planned activity. You can create the subassemblies for a planned activity only if the Activity Use field is set to Depot Repair and the Item is specified in the Planned Activities (tsspc2100m000) session.

Note: 
  • To view this session, you must select the Repair Center check box in the General Service Parameters (tsmdm0100m000) session and the Use Subassemblies in Work Orders check box in the Work Order Parameters (tswcs0100m000) session.
  • When the planned activity is deleted, the linked subassemblies also must be deleted.

Field Information

Planned Activity

The planned activity for which the subassembly is created.

Note: This value is defaulted from the Planned Activities (tsspc2100m000) session.
Activity Line

The planned activity line number.

Note: This value is defaulted from the Planned Activities (tsspc2100m000) session.
Line

The line number for the subassembly.

Item

The item specified for the subassembly.

Note: This item must not be same as the Item specified in the Planned Activities (tsspc2100m000) session.
Description

The description or name of the code.

Serial Number

The serial number of the item for which the subassembly is created.

Note: 
  • The combination of the specified Item and Serial Number must exist in the Serialized Items (tscfg2100m000) session. This combination must be different from the Item and Serial Number combination specified in the Planned Activities (tsspc2100m000) session, Subcontracting being an exception.
  • This value must be linked only to the Installation Group linked to the planned activity in the Planned Activities (tsspc2100m000) session.
Planned Quantity

The quantity of the subassembly item.

Note: 
  • This value is defaulted from the Items - Service (tsmdm2100m000) session. The value in this field is set to 1 and you cannot modify this value if the Configuration Controlled field is set to Serialized in the Items - Service (tsmdm2100m000) session for the subassembly item .
  • The value in this field is considered valid only if the value you specify is greater than zero.
Quantity Unit

The unit used to express the planned quantity.

Action Outgoing Subassembly

The action performed on the outgoing subassembly.

Allowed values

To Location

The subassembly is transferred to the specified location. The subassembly is received from this location for assembly activity.

To Location for Work

The subassembly is transferred to the specified location. A work order is generated to perform additional work on the subassembly.

To Warehouse

The subassembly is transferred to the specified warehouse. The value is defaulted from the Service Offices (tsmdm1100m000) session. However, you can change the value. The subassembly can also remain in the warehouse. The Ownership of the subassembly must be set to Company Owned. The Action Incoming Subassembly field must be set to No Action. To replace the subassembly, a material resource line must be created.

To Department

The subassembly is transferred to the specified department. A new work order must be created for the department to which the subassembly is transferred. The related orders (the initiating work order and the related work order) are maintained in the Related Orders (tsmdm4500m000) session.

To Subcontractor

The subassembly is transferred to the specified subcontractor. When the outgoing subassembly is processed, a subcontracting activity is added to the work order. When this activity is released, a subcontracting purchase order (with the cost item) is generated for the work order.

Note: The subassembly is specified on the Purchase Orders (tdpur4100m000) header.
To Scrap

The subassembly is scrapped. No incoming subassembly is created. You can replace the subassembly with a new part (item) from the warehouse.

To be Decided

The process is stopped until another action for the outgoing subassembly is specified.

Not Applicable
Note: This value is defaulted from the Items - Service (tsmdm2100m000) session. However, you can modify this value.
Site

The code of the site to which the Warehouse is linked.

Note: 
  • This field is enabled only if the Action Outgoing Subassembly field is set to To Warehouse.
  • This field is displayed only if the Sites field is set to Active or In Preparation in the Implemented Software Components (tccom0100s000) session.
Location

The code of the location to which the outgoing subassembly is transferred.

Note: This field is enabled and mandatory when Action Outgoing Subassembly is set to To Location or To Location for Work.
Description

The description or name of the code.

Warehouse

The code of the warehouse to which the outgoing subassembly is transferred.

Note: 
  • This field is enabled and mandatory when the Action Outgoing Subassembly field is set to To Warehouse or To Department. In this scenario, the value is defaulted from the Warehouse Outgoing Parts field in the Service Offices (tsmdm1100m000) session, based on the Department in the Planned Activities (tsspc2100m000) session.
  • This field is enabled and mandatory when the Action Outgoing Subassembly field is set to To Subcontractor and the Supply Item to Subcontractor check box is selected in the Reference Activities (tsacm1101m000) session for the Reference Activity. In this scenario, the value is defaulted from the Warehouse Outgoing Parts field in the Service Offices (tsmdm1100m000) session, based on the Work Center or the Service Office specified in the Reference Activities (tsacm1101m000) session for the Reference Activity.
Description

The description or name of the code.

Operations Department

The code of the department to which the outgoing subassembly is transferred.

Note: 
  • This field is enabled and mandatory when Action Outgoing Subassembly is set to To Department.
  • The Warehouse Incoming Parts must be defined for this department in the Service Offices (tsmdm1100m000) session.
  • This value must not be same as the Operations Department specified in the Planned Activities (tsspc2100m000) session.
Description

The description or name of the code.

Action Incoming Subassembly

The action performed on an incoming subassembly.

Allowed values

From Location

The subassembly is received from the specified location. The Disassembly Activity must be processed to receive the item.

From Location for Work

The subassembly is received from the specified location. The Assembly Activity is executed only after the related work order for the subassembly is completed and closed.

From Warehouse

The subassembly is received from the specified warehouse. A warehouse order is created when the Disassembly Activity is processed. The Assembly Activity is executed only after the item is delivered by Warehousing . If the outgoing subassembly is scrapped, you can generate a material resource line to replace the item.

From Department

The subassembly is received from the specified department. The Disassembly Activity must be processed to receive the item. The Assembly Activity is executed only after the related work order is created.

From Subcontractor

The subassembly is received from the specified subcontractor. The assembly activity is executed only after the outgoing subassembly is processed and the subcontracting purchase order is generated.

No Action

The assembly activity does not use this subassembly.

To be Decided

The process is stopped until another action for the outgoing subassembly is specified.

Not Applicable
Note: The From Warehouse and the No Action options in this field are enabled only when the Action Outgoing Subassembly is set to To Warehouse.
Master Routing

The code of the master routing applicable for the Action Outgoing Subassembly.

Note: 
  • This field is enabled when Action Outgoing Subassembly is set to To Location for Work or To Department.
  • The Reference Activity must not be specified.
  • The Activity Use field must be set to Depot Repair or General in the Master Routings (tsacm1101m100) session.
  • The master routing must be effective on the Planned Start Time specified for the Planned Activity in the Planned Activities (tsspc2100m000) session.
Description

The description or name of the code.

Routing Option

The code of the routing option applicable for the Action Outgoing Subassembly.

Note: 
  • This field is displayed only if:
    • The Use Master Routing check box is selected in the Work Order Parameters (tswcs0100m000) session.
    • The Use Routing Options check box is selected in the Activity Management Parameters (tsacm0100m000) session.
  • This field is enabled only if the Master Routing is specified.
  • LN defaults this value from the Reference Activity (tsacm1601m000) session, based on the routing option set as Default for the specified Master Routing.
Reference Activity

The code of the reference activity that must be performed on the outgoing subassembly.

Note: 
  • This field is enabled when Action Outgoing Subassembly is set to To Location for Work, To Department or To Subcontractor.
  • This field is mandatory if the Action Outgoing Subassembly is set to To Subcontractor.
  • The Master Routing must not be specified.
  • The Activity Use must be set to Depot Repair or General in the Reference Activities (tsacm1101m000) session.
  • The reference activity must be effective on the Planned Start Time specified for the Planned Activity in the Planned Activities (tsspc2100m000) session.
Scrap Reason

The reason to scrap an item.

Note: 
  • This field is enabled and mandatory only if the Action Outgoing Subassembly field is set to To Scrap.
  • The Reason Type must be set to Return for Scrap in the Reasons (tcmcs0105m000) session.
  • The reason must be effective on the Planned Start Time specified for the Planned Activity in the Planned Activities (tsspc2100m000) session.
Description

The description or name of the code.

Cost Component

The code of the cost component.

Note: 
  • This field is enabled and is mandatory if:
    • The Action Outgoing Subassembly field is set to To Warehouse or To Department.
    • The Action Outgoing Subassembly field is set to To Subcontractor and the Supply Item to Subcontractor check box is selected in the Reference Activities (tsacm1101m000) session for the specified Reference Activity.
    • The value in this field is defaulted from the Items (tcibd0501m000) session based on the Item.
Description

The description or name of the code.