Time Based - Maintenance Scenarios (tsspc1533m000)
Use this session to view the time based maintenance scenario lines and the pattern lines that use the Reference Activity or the Master Routing displayed in the header.
- You can view this session only as a satellite session in the Where Used Reference Activity/Master Routing in Preventive Maintenance (tsspc1633m000) session.
- To enable this session, you must set the Type of Scenario field to Time Based Only or Time Based and Usage Based, and select the Where Used in Maintenance Scenarios check box in the Time Based group box, in the header.
Field Information
- Process Identification
-
The process ID based on which the data is populated in this session.
- Record Type
-
Indicates the record type, for which the data is displayed, based on the reference activity or the master routing displayed in the Where Used Reference Activity/Master Routing in Preventive Maintenance (tsspc1633m000) session.
Allowed values
- Time Based - Maintenance Scenarios
- Usage Based - Serialized Items
- Time Based - Rule Book
- Time Based - Item Service Data
- Time Based - Items
- Time Based - Serialized Items
- Usage Based - Maintenance Scenarios
- Usage Based - Rule Book
- Usage Based - Item Service Data
- Usage Based - Trigger Sets
- Usage Based - Trigger Set Rule Book
- Usage Based - Items
- Reference Activity
-
The code of the reference activity linked to the maintenance scenario.
- Description
-
The description or name of the code.
- Master Routing
-
The code of the master routing linked to the maintenance scenario.
- Maintenance Scenario
-
The code of the maintenance scenario.
- Description
-
The description or name of the code.
- Second Description
-
The additional description for the maintenance scenario.
- Creation Date
-
The date and time when the maintenance scenario is created.
- Created By
-
The user who created the maintenance scenario.
- Last Modification Date
-
The date and time when the maintenance scenario is last modified.
- Last Modified By
-
The name of the user who last modified the maintenance scenario.
- Last Rule Book Modification Date
-
The date and time when the rule is last modified for the maintenance scenarios.
- Last Rule Book Modification User
-
The name of the user who last modified the rule book data for the maintenance scenarios.
- Last Rule Book Processing Date
-
The date and time when the rule book data is last processed
- Last Rule Book Processing User
-
The name of the user who last processed the rule book data.
- Maintenance Cycle
-
The time frequency for the repetition of the maintenance plan, for the maintenance scenario.
- Maintenance Cycle Unit
-
The time unit in which the period for the maintenance cycle is expressed.
- Consider Last Planned Activity Date
-
Indicates that the last planned activity date generated for the maintenance scenario, is considered to start the maintenance cycle.
- Text
-
The text related to the time based scenario line.
- Scenario Line
-
The line number of the maintenance scenario.
- Description
-
The description or name of the code.
- Scenario Line Type
-
The type of maintenance scenario line.
Allowed values
- Time Based
-
For a time based maintenance scenario, the maintenance plan is generated either on master routing or for a reference activity.
- Usage Based
-
For a usage based maintenance scenario, the maintenance plan is generated if the scenario line is setup for a specific child item that matches with the item of the serialized item.
- Time Based Pattern
-
For a time based pattern maintenance scenario, the maintenance plan is generated either on master routing or for a reference activity.
- Specific Child Item
-
Indicates that the specific child item can be specified for the maintenance scenario line.
- Child Item
-
The child item for which the maintenance plan is generated.
- Divide Frequency Based on Life Cycle
- Cyclic
-
Indicates that the planned activities are generated periodically within the specified date range.
- Shift Related Planned Activities
-
Indicates that based on the planned start or finish date, the application changes the related planned activities that are planned at a later point in time.
- Activity Pattern
- Frequency
-
The number of times the reference activity or the master routing is executed for the maintenance scenario.
- Unit of Time Frequency
-
The unit in which the frequency is expressed.
- Activity Type
-
The activity type based on which the activity pattern is generated.
Allowed values
- Reference Activity
- Master Routing
- Not Applicable
- Reference Activity
-
The reference activity from which the planned activity is generated.
- Master Routing
-
The master routing from which the planned activity is generated.
- Overrule Planned Start/Finish Tolerance
-
Indicates that the application does not consider the tolerance period
- Tolerance Period Start
-
The maximum time period with which the start date of the generated planned activity can be shifted.
- Tolerance Period Finish
-
The maximum time period with which the finish date of the generated planned activity can be shifted.
- Maintenance Cycle
-
The time frequency for the repetition of the maintenance plan, for a maintenance scenario line.
- Maintenance Cycle Unit
-
The time unit in which the period for the maintenance cycle is expressed.
- Consider Last Planned Activity Date
-
Indicates that the last planned activity date, generated for the pattern line, is considered to start the maintenance cycle.
- Text
-
The text relevant to the time based scenario line.
- Pattern Line
-
The sequence number that links multiple pattern lines to the same scenario line.
- Specific Child Item
-
Indicates that child item can be specified for the maintenance scenario pattern line.
- Child Item
-
The child item for which maintenance plan is generated.
- Activity Type
-
The activity type based on which the activity pattern is generated.
Allowed values
- Reference Activity
- Master Routing
- Not Applicable
- Transaction Date
-
The date and time of the transaction.