Preventive Maintenance Scenario Line Patterns (tsspc1132m000)
Use this session to create and maintain patterns based on which planned activities are generated.
Field Information
- Maintenance Scenario
-
The series code that identifies the maintenance scenario.
- Description
-
The description or name of the code.
- Line
-
The maintenance scenario line number.
- Sequence
-
The sequence allows multiple pattern lines under the same scenario line.
- Reference Activity
-
The reference activity from which a planned activity is to be generated.
- Description
-
The description or name of the code.
- Activity Type
-
Indicate the activity type from which the planned activities can be generated.
Allowed values
- Reference Activity
- Master Routing
- Not Applicable
Note:- This field is displayed only if the Use Master Routing check box is selected in the Service Planning Parameters (tsspc0100m000) session.
- By default, this field is set to Reference Activity. Master Routing
- Master Routing
-
The master routing for which the pattern is generated.
- Routing Option
-
The code of the routing option.
Note: This field is enabled only if the Activity Type field is set to Master Routing. - Year Number
-
The number of year(s) after which the reference activity is performed.
- Months/ Weeks
-
The number of month(s) or week(s) after or in-which the reference activity is performed.
- Month/Week
-
The option to specify when the reference activity must be performed.
Allowed values
- Month
- Week
- Not Applicable
- Days
-
The number of day(s) after or on which the reference activity will be carried out.
- Time Period
-
The number of month(s)/week(s) and day(s) after which the reference activity is performed.
- Overrule Planned Start/Finish Tolerance
-
If this check box is selected, LN does not consider the tolerance period.
- Tolerance Period Start
-
The maximum time period with which the start date of the generated planned activity can be shifted.
- Unit for Tolerance Period
-
The unit in which tolerance period is expressed.
- Tolerance Period Finish
-
The maximum time period with which the finish date of the generated planned activity can be shifted.
- Specific Child Item
-
If this check box is selected, you can specify the child item.
- Child Item
-
The child item for which maintenance plan is generated.
- Description
-
The description or name of the code.