Contract Material Terms - History (tsctm8532m300)

Use this session to maintain the history of the selected material cost term that is associated with the coverage term that is selected from the service contract.

Note: If you must change the terms, for example, after a certain amount of material has been used, a new coverage term must be created.

Field Information

Service Contract

The service contract followed by the description of the same.

Contract Change

service contract changes

Contract Change

The description of the contract change.

Configuration Line

The line number identifying the configuration for which the total amounts apply.

Line Type

The classification of the line. The line type can either be Normal, Total or Calculation. A total line is a sum total of calculation lines. A Calculation line is a partial configuration and contributes to the overall configuration of the type Total line.

Coverage Type

The coverage type.

Coverage Term

The coverage-term number.

Fixed Price

If this check box is selected, the sales prices are setup in the service contract for the configuration line.

Note: 
  • This field is not applicable if configuration lines is not contact or quotation.
  • This field is visible only if the Use Prices in Service Contracts parameter is set to 'Yes' in Contract Management Parameters (tsctm0100m000) session.
Coverage

If this check box is selected, the Coverage and Cost Terms can be defined for the configuration line.

Note: 
  • This field is not applicable if configuration lines is not contact or quotation.
  • This field is visible only if the Use Prices in Service Contracts parameter is set to 'Yes' in Contract Management Parameters (tsctm0100m000) session.
Installation Group

installation group

Installation Group

The description of the installation group.

Item

item

Serial Number

serial number

Item Description

The description of the item.

Material Line

contract sequence number

Service Item Group

service item group

Cost Component

cost component

Cost Amount

Your company's reference currency, which is defined in the Companies (tcemm1170m000) session.

Unit Cost

standard cost

Cost Amount

cost amount

Sales Amount

sales amount

Sales Price

The sales price of the term.

Note: The price is expressed in the currency of the header.
Text
Quantity

covered quantity

Allocated

allocated quantity

Spent

spent quantity

Spent Costs

spent costs

Allocated Costs

allocated costs

Allocated Sales

allocated sales

Spent Sales

spent sales