Contract Quote Subcontracting Terms (tsctm1138m200)

Use this session to maintain the Subcontracting cost term that is associated with the coverage term, selected from the service-contract quotation.

Field Information

Contract Quote

The service-contract quotation.

Description

The description of the contract quotation.

Configuration Line

The line number identifying the configuration for which the total amounts apply.

Type of Configuration Line

The classification of the line. A total line is a sum total of calculation lines. A Calculation line is a partial configuration and contributes to the overall configuration of the type Total Line.

Allowed values

Normal Line
Total Line

A total line is a sum total of calculation lines.

Calculation Line

A Calculation line is a partial configuration and contributes to the overall configuration of the type Total Line.

Coverage Type

The coverage type.

Description

The description of the coverage type.

Coverage Line

The coverage lines number.

Cost Covering Method

The cost-covering method.

Subcontracting Line

The number used to identify the cost term of the coverage term. The default step size is 10.

Time and Material Price

Indicates that the sales price for the Configuration Line is defined based on the time and material pricing method, specified for the contract.

Note: This field is applicable only if the Use Prices in Service Contracts check box is selected in the Contract Management Parameters (tsctm0100m000) session.
Fixed Price

Indicates that the fixed Sales Price is defined for the Configuration Line in the Fixed Price Terms (tsctm1111m000) session.

Note: This field is applicable only if the Use Prices in Service Contracts check box is selected in the Contract Management Parameters (tsctm0100m000) session.
Coverage

If this check box is selected, the coverage and cost terms can be defined for the configuration line.

Note: 

This field is visible only if:

  • The Type of Configuration Line is set to Normal Line.
  • The Use Prices in Service Contracts checkbox is selected in Contract Management Parameters (tsctm0100m000) session.
Installation Group

The installation group.

Description

The description or name of the code.

Item

The item.

Serial Number

The serial number.

Item Description

The description of the item.

Quantity

The quantity of the tooling term. The default value for the field is one. You can change this value.

Unit

The units used to express the tooling term.

Subcontractor

The subcontractor responsible for carrying out any required subcontracting work.

The description or name of the code.

Item Subcontracting

The item that is subcontracted.

Note: 

You can select an item of the type:

  • Cost
  • Service
  • Subcontracted Service
Description

The description of the item. This is a display field.

Cost Component

The cost component.

Cost Amount

The cost amount is calculated using the following formula:.

Cost Amount= Quantity x Unit Cost
Sales Amount

The sales amount calculated using the following formula:

Sales Amount = Quantity x Sales Price
Term is Derived from Reference Activity

If this check box is selected, the term is derived from reference activity.