Contract Quote Tooling Terms (tsctm1137m200)
Use this session to maintain the Tooling cost term that is associated with the coverage term, selected from the service-contract quotation.
Field Information
- Contract Quote
-
The service-contract quotation.
- Description
-
The description of the contract quotation.
- Configuration Line
-
The line number identifying the configuration for which the total amounts apply.
- Type of Configuration Line
-
The classification of the line. A total line is a sum total of calculation lines. A Calculation line is a partial configuration and contributes to the overall configuration of the type Total Line.
Allowed values
- Normal Line
- Total Line
-
A total line is a sum total of calculation lines.
- Calculation Line
-
A Calculation line is a partial configuration and contributes to the overall configuration of the type Total Line.
- Coverage Type
-
The coverage type.
- Description
-
The description of the coverage type.
- Coverage Line
-
The coverage lines number.
- Cost Covering Method
-
The cost-covering method.
- Tooling Line
-
The number used to identify the cost term of the coverage term. The default step size is 10.
- Time and Material Price
-
Indicates that the sales price for the Configuration Line is defined based on the time and material pricing method, specified for the contract.
Note: This field is applicable only if the Use Prices in Service Contracts check box is selected in the Contract Management Parameters (tsctm0100m000) session. - Fixed Price
-
Indicates that the fixed Sales Price is defined for the Configuration Line in the Fixed Price Terms (tsctm1111m000) session.
Note: This field is applicable only if the Use Prices in Service Contracts check box is selected in the Contract Management Parameters (tsctm0100m000) session. - Coverage
-
If this check box is selected, the coverage and cost terms can be defined for the configuration line.
Note:This field is visible only if:
- The Type of Configuration Line is set to Normal Line.
- The Use Prices in Service Contracts checkbox is selected in Contract Management Parameters (tsctm0100m000) session.
- Installation Group
-
The installation group.
- Description
-
The description or name of the code.
- Item
-
The item.
- Serial Number
-
The serial number.
- Item Description
-
The description of the item.
- Quantity
-
The quantity of the tooling term. The default value for the field is one. You can change this value.
- Unit
-
The units used to express the tooling term.
- Item Tooling
-
The item specified as cost or service.
Miscellaneous costs such as administrative cost, hotel stay, telephone bills and so on are maintained as the Cost items or Service items. To register the cost, use the browse arrow to select the item from the Items (tcibd0501m000) session.
Note: To represent the miscellaneous cost, you can define an item of type Service or Cost in the Items (tcibd0501m000) session. - Description
-
The description of the item. This is a display field.
- Cost Component
-
The cost component.
- Cost Amount
-
The cost amount is calculated using the following formula:.
Cost Amount= Quantity x Unit Cost
- Sales Amount
-
The sales amount calculated using the following formula:
Sales Amount = Quantity x Sales Price
- Term is Derived from Reference Activity
-
If this check box is selected, the term is derived from reference activity.