Service Order Quote Coverage Terms (tsctm1120m400)
Use this session to maintain the coverage term related to a service type that is associated with the service-order quotation.
The coverage terms are added in this session if both the following conditions are met:
- A reference activity is added in the Service Order Activities (tssoc2110m000) session.
- Requirements are linked to the reference activity in the Resource Requirements (tsacm2120m000) session.
Field Information
- Service Order Quote
-
service-order quotation
- Configuration Line
-
A list of configurations covered by a contract quotation, which will be covered by a service contract once the contract quotation becomes a service contract or which are related to a service-order quotation.
- Type of Configuration Line
-
The classification of the line. The line type can either be Normal, Total or Calculation. A total line is a sum total of calculation lines. A Calculation line is a partial configuration and contributes to the overall configuration of the type Total line.
- Coverage Type
- Term Type
- Coverage Term
- Cost Covering Method
-
The cost-covering method.
- Cost Terms
- Ceiling Amount
-
The agreed limit up to which the costs are covered by:
- The contract
- The quotation
- The order
- The warranty.
If you select the Ceiling cost covering method, this is the price limit.
In this case the phase term holds the price information.
Note: If the coverage term has more than one phase, each phase can have a separate limit. - Coverage
-
The discount percentage.
In this case the phase term holds the discount information.
Note: If the coverage term has more than one phase, then each phase can have a separate discount. - Text
- Costs
-
Your company's reference currency, which is defined in the Companies (tcemm1170m000) session.
- Sales
- Budgeted
- Spent
- Allocated
- Budgeted Costs
-
cost amount
- Spent Costs
- Allocated Costs
- Budgeted Sales
-
sales amount