Create Item Breakdown from Standard Production BOM (tscfg1210m200)

Use this session to create an item breakdown from a standard production bill of material (P-BOM).

You can link the item breakdown to an Installation in the Installations (tsbsc1110m000) session as a so-called anonymous item.

Note: 
  • Only P-BOM items listed in the Items - Service (tsmdm2100m000) session, and/or the Item Service Defaults (tsmdm2105m000) session, will be copied to the newly created item breakdown.
  • The project segment of the item cannot be used in this session.
  • If you create an item breakdown for manufactured items with a BOM quantity greater than one (1), a decimal quantity of item-breakdown components can result.

Field Information

Production BOM

The item from which you want to copy the product structure to an item breakdown.

Note: The project segment of the item cannot be used in this session.
Description

The description of the P-BOM item.

Check Effectivity

If this check box is selected, LN only copies the items of the P-BOM that are valid on the date you enter in the Expiry Date field.

Note: The P-BOM items that expire after the entered date are also copied.

If this check box is cleared, LN copies all items of the P-BOM.

Effective On

LN only copies the items of the P-BOM that are valid on this date/time.

Note: 
  • The P-BOM items that expire after the entered date are also copied.
  • Clear the Check Effectivity check box to copy all the P-BOM items.
Copy Alternative Material

Select the checkbox to copy the alternative items along with the item breakdown details from the production BOM.