To recalculate amounts of planned maintenance
You can recalculate the cost amounts for a planned activity in the Planned Activity - Costs Overview (tsspc2513m000) session. Three situations are possible:
- The amounts are stored by Installation group. The Installation Group and the Cost Type fields must be filled. The other fields remain empty.
- The amounts are stored by planned activity. The Installation Group, the Activity, the Activity Number and the Cost Type fields must be filled. The other fields remain empty.
- The amounts are stored by serialized item. The Installation Group, the Item, the Serial Number and the Cost Type fields must be filled. The other fields remain empty.
The cost type is used for the Material values, Labor, and Other.
If a requirement line is added, deleted, or modified, LN calculates and updates the amounts for the related activity and the related Installation groups and serialized items.
If an activity is added or deleted to an Installation group, LN recalculates and updates the amounts of that Installation group and the possible related serialized items.
If the Item field is changed for a planned activity, LN updates the amounts of that serialized item and the related Installation group.
If you choose
on the appropriate menu, all records of this table are updated (when applicable).The cost changes in the following sessions affect the cost amounts:
- Item - Costing (ticpr0107m000)
- Labor Rate Codes (tcppl0190m000)
- Tasks (tsmdm0115m000)
- Service Offices (tsmdm1100m000)
- Planned Activities (tsspc2100m000)
- Planned Activity - Material Requirements (tsspc2110m000)
- Planned Activity - Labor Requirements (tsspc2111m000)
- Planned Activity - Other Requirements (tsspc2112m000)
- Planned Activity - Costs Overview (tsspc2513m000)