Rebuilding Repair Cost and Sales
-
Access the Rebuild Repair Cost and Sales Amounts (tstdm4210m000) session.
-
Specify the information in the Selection Range to add missing cost lines for
closed orders.
-
Select the Select from History
Orders check box the related cost and sales order is also
retrieved from the logged history data.
-
Select the Process Report or
Error Report check box as
required.
-
Click Rebuild.
Note:
- For each order in the selection range the data in table Repair Cost
and Sales (tstdm410) is removed. If the originating order still
exist the data is added again. This is a way the user can control
the deleting of records in this table. Deleting the originating
order deletes the related order from the table.
- For new orders, the table must be filled automatically when the
order is costed. The session can still be used when data gets
corrupt someway. Corrupted records are deleted, and new records are
created.
- The application always creates the item breakdown for one (1) parent
item. Therefore, if the BOM quantity of the top item in the
production BOM is greater than one (1), the application converts the
quantity of the BOM items to a top-item quantity of one (1).
- If you create an item breakdown for manufactured items with a BOM
quantity greater than one (1), this can result in a decimal quantity
of the item-breakdown components.
- The application copies production-BOM (P-BOM) items listed in the Items - Service (tsmdm2100m000) session or the Item Service Defaults (tsmdm2105m000) session to the new item breakdown. P-BOM Items that are
only listed in the Item Service Defaults (tsmdm2105m000) session are copied (based on the defaults) to the Items - Service (tsmdm2100m000) session, by the application, when you create the new
item breakdown.
- The application copies the production-BOM items with a quantity
greater than zero (0).
- The application copies the production-BOM items that are
serial-number controlled. Make sure that the Serialized check box in the Items (tcibd0501m000) session is selected for the BOM items.
- You can create a physical breakdown from the item breakdown with the Create Physical Breakdown Structure (tscfg2210m000) session.