tpest domains
- Free
-
The initial status of the bid.
- Accepted
-
The status of the bid after the same is approved.
- Rejected
-
The status of the bid after the same is rejected.
- Direct
-
The direct costs for the estimate line are generated.
- Indirect
-
The indirect costs for the estimate line are generated.
- Top Down
-
Calculating the cost or sales amount in a top down structure means you distribute a top amount to the lower level elements. There is no aggregation of the costs. The structural element you work from determines the amount. The rule is that LN looks for amounts on estimate lines on level Total/Cost Type/Other Structure/Detail and in that order.
- Bottom Up
-
Calculating the cost or sales amount in a bottom up structure means you give exact amounts for lowest level elements and aggregate them to make the top amount.
- Total
- Cost Type
- Other Structure
- Detail
- Launch Estimate to Budget
- Verify Top Down Estimate
- Manual
-
The price for an estimate line is entered manually.
- Excel
-
The price for an estimate line is calculated in Excel at the field level.
- Price Book
-
Valid for an item, cost type equipment, and subcontracting; the price is calculated from the price books (price matrix and search sequence) or the purchase contract.
- Configurator
-
The price of the configurator item is specified. The product variant of the generic item on the estimate line is used.
- Cost Object
-
- Unit cost or purchase price.
- Purchase price of the item purchase data.
- Unit cost of the item costing data.
- Purchase contract price of project.
- Unit cost of wage rate as defined in the Labor Rate Code - Rates (tcppl0191m000) session.
- Labor Rate
-
This rate is based on the labor rates defined in the Labor Rate Code - Rates (tcppl0191m000) or the Specific Labor Rates (tcppl0192m000) session.
- RFQ
-
The price for the estimate is calculated from the RFQ created using the Create Request for Quotation option in the Estimate Lines (tpest2100m000) session. Infor LN sets the value to RFQ when you click the button.
- Manual
-
The price for an estimate line is entered manually.
- Excel
-
The price for an estimate line is calculated in Excel at field level.
- Price Books
-
Valid for an item, cost type equipment, and subcontracting; the price is calculated from the price books (price matrix and search sequence) or the purchase contract.
- Configurator
-
The price of the configurator item is specified. The product variant of the generic item on the estimate line is used.
- Cost Object
-
- Sales price.
- Sales price of wage rate as defined in the Labor Rate Code - Rates (tcppl0191m000) session.
- Wage Rate
-
This rate is based on the labor rates defined in the Labor Rate Code - Rates (tcppl0191m000) or the Specific Labor Rates (tcppl0192m000) session.
- RFQ
-
The price for the estimate is calculated from the RFQ created using the Create Request for Quotation option in the Estimate Lines (tpest2100m000) session. Infor LN sets the value to RFQ when you click the button.
- Markup
-
Adding a margin to the cost based on cost multipliers. The markup can be a profit margin, tax, management fee, or other factor specific to the company.
gross sales amount = landed cost amount + contingency + escalation + markup
Note: a markup percentage or amount is displayed for information purposes only.
- Target Pricing
-
In many cases, the target price for the estimate is fixed. If so, the sales price is, for example, determined by a price list.
gross sales amount = quantity * gross sales price
- Cost Amount
- The net sales amount is calculated as the sum of the cost amounts of the selected estimate lines.
- Markup
- A percentage of the total cost amount is added to the existing total cost amount to calculate the net sales amount.
- Sum of All Lines
- The net sales amount is calculated as the sum of the sales amounts of the selected estimate lines.
- Price Book
- The net sales amount is calculated by multiplying the item quantity with sales cost specified for the item in the price book.
- Free
- Active
- Finished
- Closed
- Archived
- Blocked
- Primary Structure
- Sort Structure
- User-Defined Status
-
Not applicable If you leave the Sort By field empty, the lines are renumbered without a reorganizing of the structures.
- Free
-
If the status is Free, you can change or add data.
- Final
-
If the status is Final, data is frozen.
- Activity
-
A project activity structure, defined in the Activities (tppss2100m000) session for the project.
- Element
-
A project element structure, defined in the Elements (tpptc1100m000) session.
- Cost Component
-
A cost component structure is a flat structure, defined in the Cost Components (tcmcs0148m000) session.
- Extension
-
An extension is created in the Project Extensions (tpptc0510m000) session.
- User Defined
-
A user defined structure is the only structure type that can be defined more than once for a version. A user defined structure can be, for example, an organization breakdown structure.
Note: This option is available only if the All Activity Types check box is selected in the Project Parameters (tppdm0100s000) session.
- To Create Project-related Cost Object
-
To create project-related cost objects that use the Buy-from Business Partner specified in the Estimate Lines (tpest2100m000) session.
- As Buy-from BP on Budget Line
-
The buy-from business partner specified in the budget line is used.
- Ignore
-
The data is not used. This option is used when there is a discrepancy. For example, if the buy-from BP specified for the estimate line is different from the buy-from BP specified for the budget line.
- Current
-
The current price and cost rates derived from the price books or the price specified for the cost objects.
- Average
-
The average price and cost rates calculated based on the actual costs.
Note: As the actual cost can fluctuate over the period of time, the average price or rate for each cost object is calculated. - Latest
-
The latest price and cost rates from the actual costs.
Note: As the actual cost can fluctuate over the period of time, the latest actual price or rate for each cost object is calculated.
- as Sundry Cost Type
- with Base Cost Type