Time Phased Budget (Planned Value by Period) (tpptc5521m000)
Use this session to display the generated planned value of an activity by period for a selected project and analysis code.
The session also displays the time phased budget version and baseline for which the planned value is generated.
Field Information
- Project
-
The code that uniquely identifies the project.
- Description
-
The description or name of the code.
- Project Status
-
The project status.
- Analysis Code
-
The time phased budget analysis code.
- Version
-
The code that uniquely identifies the time phased budget version.
- Description
-
The description or name of the code.
- Version Status
-
The budget status.
- Baseline
-
The code that uniquely identifies the baseline
- Description
-
The description or name of the code.
- Baseline Status
-
The status of the baseline.
- Activity
-
The code that uniquely identifies the activity.
- Description
-
The description or name of the code.
- Budget Status
-
The budget status of the activity.
- Year
-
The period for which the planned value is calculated.
- Period
-
The period.
- Time Phased Budget Origin
-
Indicates the origin of the generated time-phased budget.
Allowed values
- Manual
-
The time-phased budget can only be inserted manually or imported.
- Generate
-
The time-phased budget can only be generated.
Note: This value is defaulted from the Create Time Phased Budget field in the Top Down Budget Versions (tpptc5500m000) session. - Currency
- Material Amount
-
The planned value of the cost-type material.
- Labor Amount
-
The planned value of the cost-type labor.
- Equipment Amount
-
The planned value of the cost-type equipment.
- Subcontracting Amount
-
The planned value of the cost-type subcontracting.
- Sundry Cost Amount
-
The planned value of the cost-type sundry cost.
- Overhead Amount
-
The imported or manually specified overhead amount.
- Total Amount
-
The total amount. This amount includes the Overhead Amount.