Budgeted Costs by Labor Control Code (tpptc3551m000)

Use this session to display the budgeted amounts and quantities with a cost-type of labor for:

  • The selected project
  • The budget-cost analysis code

The data is sorted by control code.

Field Information

Project

The code that uniquely identifies the project.

Project Status

The project's status.

Budget Cost Analysis Version

The code that uniquely identifies the cost analysis.

Last Calculation Time

The date on which the latest budget-cost analysis was performed via the Generate Budget Cost Analysis (tpptc3200m000) session for the selected budget-cost analysis code.

Currency

The default currency in the overview session is the project currency. Both in a dependent and in an independent currency system you can change this currency to other currencies with the Rotate Currency option <CTRL-R>.

The following sequence is applicable:

  1. Project currency
  2. Local currency
  3. Reporting currency 1
  4. Reporting currency 2
Note: Only the last three currencies are home currencies.
Control Code

The code that uniquely identifies the control code.

Reference Type

The nature of the control code.

No. of Labor Hours

The number of labor units for which the costs were budgeted.

Amount

The sum of the budgeted costs on the line.