Budgeted Extension Costs (Material) (tpptc3530m000)
Use this session to list budgeted extensions of the material cost-type for:
- The selected project
- The budget-cost analysis version
Field Information
- Project
-
The code that uniquely identifies the project.
- Project Status
-
The project's status.
- Budget Cost Analysis Version
-
The code that uniquely identifies the cost analysis.
- Last Calculation Time
-
The date on which the latest budget-cost analysis was performed via the Generate Budget Cost Analysis (tpptc3200m000) session for the selected budget-cost analysis code.
- Extension
-
The code that uniquely identifies the extension.
- Currency
-
The default currency in the overview session is the project currency. Both in a dependent and in an independent currency system you can change this currency to other currencies with the Rotate Currency option <CTRL-R>.
The following sequence is applicable:
- Project currency
- Local currency
- Reporting currency 1
- Reporting currency 2
Note: Only the last three currencies are home currencies. - Item
-
The code that uniquely identifies the item.
- Quantity
-
The quantity of the material for which the material costs on the budget line were computed.
- Unit
-
The code that uniquely identifies the unit.
- Amount
-
The total amount of the budget line.