Print Activity Budgets (tpptc2410m000)
Use this session to print the activity-budget line details for the selected activity (or activities) and project(s).
You can limit the printout by budget line number, cost-type and/or status.
Field Information
- Budget Material Lines
-
If this check box is selected, the budget lines with a material cost-type are included in the print.
- Activity Text
-
If this check box is selected, the print includes general text that relates to this check box.
- Budget Labor Lines
-
If this check box is selected, the budget lines with a labor cost-type are included in the print.
- Cost Object Text
-
If this check box is selected, the print includes general text that relates to this check box.
- Budget Equipment Lines
-
If this check box is selected, budget lines with a equipment cost-type are included in the print.
- Budget Line Text
-
If this check box is selected, the print includes general text that relates to this check box.
- Budget Subcontracting Lines
-
If this check box is selected, the budget lines with a subcontracting cost-type are included in the print.
- Budget Sundry Cost Lines
-
If this check box is selected, the budget lines with a sundry costs cost-type are included in the print.
- Based on
-
The indicator for status-related selections.
Not Applicable
All activities and budget lines are included, regardless of their status.
Activities
Only activities with a selected status are included.
Budget Lines
Only budget lines with a selected status are included.
- Not Applicable
- Activities
- Budget Lines
- Currency
-
The home currency. In an independent currency system you can rotate between the company currencies. In a dependent situation you can also rotate but the home currency amount is always calculated with the reference currency and not directly with the rate amount.
- Free
-
If this check box is selected, activities or budget lines with the Free status are printed.
- Actual
-
If this check box is selected, activities or budget lines with the Actual status are printed.
- Final
-
If this check box is selected, activities or budget lines with the status Final are printed.