Print Budget Cost Surcharges (tpptc0420m000)
Use this session to print the surcharges recorded for calculation on the budgeted costs by project.
You can:
- Select the relevant project, sundry cost range, and date range,
- Specifiy a sort order of project, cost type, or cost component.
- Indicate the required budget line status value(s).
Field Information
- Cost Surcharges by Project
-
If this check box is selected, the print is sorted by project.
- Budget Status 'Free'
-
If this check box is selected, budget lines with a Free budget line status can be included in the print.
- Cost Surcharges by Cost Type
-
If this check box is selected, the print is sorted by cost-type.
- Budget Status 'Actual'
-
If this check box is selected, budget lines with an Actual budget line status can be included in the print.
- Cost Surcharges by Cost Component
-
If this check box is selected, the print is sorted by cost component.
- Budget Status 'Final'
-
If this check box is selected, budget lines with a Final budget line status can be included in the print.
- Date Selection
-
If this check box is selected, you can limit the content of the print by date.
- Effective on
-
Specifies the validity date for surcharges to be printed. Only surcharges valid on this date are printed. The default is today's date.
- Print Sundry Cost Texts
-
If this check box is selected, text that relates to this check box is included in the print.
- Currency
-
The currency.
- Labor
-
If this check box is selected, budget lines with a cost type of labor can be included in the print.
- Equipment
-
If this check box is selected, budget lines with an equipment cost-type can be included in the print.
- Subcontracting
-
If this check box is selected, budget lines with a subcontracting cost-type can be included in the print.
- Sundry Cost
-
If this check box is selected, budget lines with a sundry cost cost-type can be included in the print.
- Item
-
If this check box is selected, budget lines with a material cost type can be included in the print.
-
- Detailed Report
-
If this check box is selected, LN prints the details of the budget cost surcharges. If this check box is cleared, LN prints a summary of the budget cost surcharges.