External Scheduling Tasks (tppss2133m000)
Use this session to view the task related project data linked to the external scheduling package.
The data in this session is populated from the External Scheduling Interface (tppss2231m000) session, when you import/ export the LN project data from/ to an external scheduling interface.
Field Information
- Project
-
The code of the project for which the external scheduling package is used.
- Description
-
The description or name of the code.
- Plan
-
The plan that must be used for the import or export of the project data to or from an external scheduling package.
- Description
-
The description or name of the code.
- Connection Node
-
The activity or node of the Infor LN Project (related to tasks) that must be connected to the activity or node of a project in the external scheduling package. If you link a complete project in LN to a project in the external scheduling package, this node is not specified.
- Description
-
The description or name of the code.
- Activity
-
The activity linked to the project.
- Description
-
The description or name of the code.
- Budget Type
-
The budget type linked to the activity.
Allowed values
- Labor
- Materials
- Equipment
- Subcontracting
- Sundry Costs
- Not Applicable
- Line
-
The line number of the activity.
- Level
-
The level of the activity in the project.
- Parent Activity
-
The parent activity to which the activity is linked.
- Description
-
The description or name of the code.
- Object
-
The Object linked to the project.
- Description
-
The description or name of the code.
- Start Date
-
The date and time when the project is scheduled to start.
- Finish Date
-
The date and time when the project is scheduled to end.
- Unit Determinator
-
The entity based on which the project performance is measured and monitored.
- Duration in Hours
-
The expected time in hours that is required for the project to be executed.
- Duration
-
The expected time required for the project to be executed.
- Time Unit Duration
-
The unit in which the duration of the project is expressed.
- Quantity
-
The quantity of the resources required to carry out the task.
- Unit
-
The unit in which the quantity is expressed.
- Resource Quantity
-
The quantity of the resources required to carry out the tasks in the project.
- Resource Unit
-
The unit in which the resource quantity is expressed.
- Schedule Mode
-
The method in which the project is scheduled.
Allowed values
- Auto Scheduled
-
The task is exported to XML based on automatic planning. When this option is used, the tag in the XML contains the value 0.
- Manually Scheduled
-
The task is exported to XML based on manual planning. When this option is used, the tag in the XML contains the value 1.
Note: If this option is selected, the Manual Start date, Manual Finish date and Manual duration are set.
- Text
-
If this check box is selected, a text is present.
- Early Start Date
-
The earliest date and time when the project can be scheduled to start.
- Late Start Date
-
The late date and time when the project can be scheduled to start.
- Early Finish Date
-
The earliest date and time when the project can be scheduled to end.
- Late Finish Date
-
The late date and time when the project can be scheduled to end.
- Free Float in Hours
-
The float time in the project. This is expressed in hours.
- Total Float in Hours
-
The total float time in the project. This is expressed in hours.
- Actual Start Date
-
The date and time when the project starts.
- Actual Finish Date
-
The date and time when the project ends.
- Constraint Type
-
The type of constraint applicable for the activities in the project.
Allowed values
- As Soon As Possible
- As Late As Possible
- Must Start On
- Must Finish On
- Start No Earlier Than
- Start No Later Than
- Finish No Earlier Than
- Finish No Later Than
- Constraint Date
-
The date and time when the constraint type is applicable.
- Deadline Date
-
The date and time when the project must be completed.
- Unit Cost in Budget Currency
-
The unit cost associated with the activity of the project. This is expressed in the currency that is linked to the budget.
- Currency
- Cost in Budget Currency
-
The cost associated with the activity of the project. This is expressed in the currency that is linked to the budget.
- Budget Currency ISO Code
-
The ISO code of the budget currency
- Description
-
The description or name of the code.
- Cost in ESP Currency
-
The cost associated with the activity of the project. This is expressed in the currency that is supported by the external scheduling package (ESP).
- Currency ESP
-
The currency that is supported by the external scheduling package.
- Work in Hours
-
The duration in which the work is planned to be completed. This is expressed in hours.
- Actual Work in Hours
-
The actual duration in which the work is completed. This is expressed in hours.
- Remaining Work in Hours
-
The remaining work to be completed. This is expressed in hours.
- Actual Duration in Hours
-
The actual duration of the work. This is expressed in hours.
- Milestone
-
Indicates if a milestone is associated with the activity of the project.
- Primary Key
-
The primary key associated with the activity of the project in the external scheduling package.
- ESP Reference
-
The reference number linked to the external scheduling package (ESP).
- Percent Complete
-
The percentage of project data synchronization completed with the external scheduling package.
- ESP Parent Reference
-
The parent number of a Task in ESP.
- Resource Primary Key
-
The primary key of the resource linked to the project in the external scheduling package.
- ESP Assignment Reference
-
The reference number of the assignments in the external scheduling package.
- ESP Resource Reference
-
The reference number of the resource in the external scheduling package.
- Calendar
-
The calendar used by the external scheduling package.
- Description
-
The description or name of the code.
- Calendar Availability Type
-
The calendar availability type used by the external scheduling package.
- Description
-
The description or name of the code.
- ESP Base Calendar Reference
-
The reference number of the base calendar in the external scheduling package.
- OBS Code
-
The code of the organization breakdown structure (OBS) linked to the activity of the project.
- OBS Element
-
The organization breakdown structure element that is linked to activity of the project
- OBS ESP Reference
-
The reference number of the OBS in the external scheduling package.
- ESP GUI id
-
The identification number of the GUI that is linked to the external scheduling package.
- ESP GUI sub id
-
The sub identification number of GUI that is linked to the external scheduling package.
- Task exists in XML
-
Indicates if the task data exists in the XML file.
- Synchronization Status
-
The status of the synchronization of the LN project data with the external scheduling package.
Allowed values
- Synchronized
- Delete
- Modify
- New
- Initial
- Transfer to XML
-
Indicates if the task data is transferred or saved to the XML file.