Print Cost Control by Project/Activity/Cost Object (tpppc4451m000)

Use this session to print cost control data on project level. This session has almost the same functionality as the Print Cost Control (tpppc4411m000) session. However, the Print Cost Control by Project/Activity/Cost Object (tpppc4451m000) session uses the display tables made by the Build Actual Cost Control (tpppc4803m000) session As a result the Print Cost Control by Project/Activity/Cost Object (tpppc4451m000) session very quickly builds up the cost control data.

Note: 
  • You must first run the Build Actual Cost Control (tpppc4803m000) session in order to use the display tables.
Note: 
  • The extensions are always included
  • No period selection is possible, data is built up till Year Actual Cost Control Period and Actual Update Period
  • No general totals will be given, because of counting different currencies
  • The columns are printed according to the layout of Print Cost Control (tpppc4411m000)

Field Information

Currency

The currency.

Commitments

If this check box is selected, project commitments are printed.

Final Result Forecast

If this check box is selected, a final result forecast entered in the Revenue Forecast (tpppc3506m000) session is printed in two columns in your report.