Print Project Control (tpppc4420m000)
Use this session to print project control, purchase control, and order-control reports. Reports can be based on project, project/element, project/activity, and project/extension.
The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session.
Field Information
- Report Type
-
The type of report you want to print.
Allowed values
- Project Control
- Purchase Control
- Order Control
- Level to be Printed
-
The level on which the data is printed. The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session.
- Period to
-
The year up to which the level is to be printed.
- /
-
The period to which the level is to be printed.
- Currency
- Sort By
-
Indicates how you want to sort the level.
- Sort Project by
-
Indicates how you want the project to be sorted.
- WBS
-
If this check box is selected, the work breakdown structure elements are printed.
- Control Accounts
-
If this check box is selected, the control accounts are used in the print.
- Planning Packages
-
If this check box is selected, the planning packages are used in the print.
- Work Packages
-
If this check box is selected, the work packages are used in the print.
- Material
-
If this check box is selected, this cost control cost type is printed.
- Labor
-
If this check box is selected, this cost control cost type is printed.
- Equipment
-
If this check box is selected, this cost control cost type is printed.
- Subcontracting
-
If this check box is selected, this cost control cost type is printed.
- Sundry Cost
-
If this check box is selected, this cost control cost type is printed.
- Break-Down Lines
-
If this check box is selected, the project breakdown-lines are printed.