Print Costs by Period (tpppc4416m000)
Use this session to print control reports for the actual costs by cost control periods.
The levels at which cost control is generated are selected in the Project - Cost Control Levels (tppdm6102m000) session.
Field Information
- Level to be Printed
-
The level on which the data is printed.
- Cost Control Period
-
The year in which the transaction must be posted to the project history for cost control. The default value of this field is the year of the date of input's cost-control period.
- /
-
The period in which the transaction must be posted to the project history for cost control. The default value of this field is the date of input's cost-control periods.
- Currency
-
The currency in which the amounts are printed.
- Costs by Project
-
If this check box is selected, the costs are printed by project.
- Summary
-
If this check box is selected, the summary totals are printed.
- Commitments
-
If this check box is selected, the commitments are taken as costs.