Print Hours by Period (tpppc4415m000)
Use this session to print control reports for hours that employees worked on projects. Reports can be based on project, employee, control code, and subcontracting.
Field Information
- Labor
-
If this check box is selected, a range of control codes can be printed.
- Subcontracting
-
If this check box is selected, a range of subcontracting can be printed.
- Hours Control Period
-
The year of the hours transaction.
- /
-
The period in which the transaction must be posted to the project history for cost control.