Print Posting Report (tpppc4402m000)
Use this session to print transactions that are posted to the project history and Financials by using the Post Transactions (tpppc4202m000) session. Reports can be sorted by run number/employee or run number/project.
Field Information
- Selection Range
-
- Selection Range
-
Use the fields in the selection range to specify the data based on which the report is sorted.
- from
-
The From and To fields define a range of: date, time, and run numbers used to sort the posting report.
- Project
-
The From and To fields define a range of projects, based on which the report is sorted.
- Project Selection
- Employee
-
The From and To fields define a range of employees.
- Material
-
If this check box is selected, material is printed in the selection.
- Equipment
-
If this check box is selected, equipment is printed in the selection.
- Sundry Cost
-
If this check box is selected, this cost object is printed in the selection.
- Labor
-
If this check box is selected, labor is printed in the selection.
- Subcontracting
-
If this check box is selected, subcontracting is printed in the selection.
- Revenues
-
If this check box is selected, revenue is printed in the selection.
- Interim Result
-
If this check box is selected, interim results are printed in the selection.
- Sort By
-
The sort sequence.