Structural Materials to be Settled by Project (tpppc3530m000)
Use this session to list the structural material linked to a project, an element, an activity, and an extension.
During this session, the price changes of the material can be settled for this project on the basis of the index value.
Field Information
- Project
-
The project code.
- Project Status
-
The project status.
- Material
-
The item's code.
- Reference Date
-
The reference date used to compute the index value.
Each start date (and indirectly all dates between two successive start dates) is assigned an index value.
In the case of a settlement, the index value for the period of the reference date is relevant for the selected fluctuation settlement.
- Index Table
-
The table containing the price changes for structural material. Depending on the situation, some structural materials require the use of different index tables.
The index table, in combination with the item, must be present.