Structural Materials to be Settled by Element (tpppc3132s000)
Use this session to link elements with a combination of project, item and material. You can record the percentage of the structural material as compared to the total item, and the item's percentage as compared to the total quantity of the element. In this way you can settle the price changes for structural materials.
Field Information
- Project
-
The code that identifies the project.
- Project Status
-
The project status.
- Material
-
The structural material for which the indices are recorded.
- Item
-
The item's code.
- Element
- Material [%]
-
The percentage of structural material as compared to the total item quantity.
Example
Material = bitumen Item = tar Material Percentage = 30%
This means that 30% of tar consists of bitumen.
- Item %
-
The item's percentage as compared to the total quantity of the element.
Example
Item = tar Element = overlay pavement Item percentage = 50%
This means that 50% of the Overlay Pavement element consists of tar.
- Last Settlement Date
-
The date on which the material fluctuation settlement was carried out, using the Generate Material Settlement Transactions (tpppc3205m000) session.