Cost Surcharges by Cost Type (tpppc2581m000)
Use this session to list cost surcharges for a combination of the project, the cost type, and the surcharge code.
Field Information
- Project
-
The code that identifies the project.
- Project Status
-
The project status.
- Cost Type
-
The cost type to which the surcharge must be posted.
Allowed values
- Labor
-
The overheads are calculated for Labor cost type.
- Overhead
-
The overheads are calculated for Overhead cost type.
- Materials
-
The overheads are calculated for Material cost type.
- Equipment
-
The overheads are calculated for Equipment cost type.
- Subcontracting
-
The overheads are calculated for Subcontracting cost type.
- Sundry Costs
-
The overheads are calculated for Sundry cost type.
- Sundry Cost
-
The sundry costs code
- Sequence Number
-
The sequence number code.Uniquely identifies the surcharge.
- Percentage
-
The surcharge percentage specified for the cost to calculate the surcharge amount.
- Posting Method Finance
-
Indicates the process to post surcharges to Financials , following the registration of costs and revenues.
- Element
-
The element code to which the calculated surcharge must be posted. If you leave this field blank, the surcharge is posted to the element under which the cost, on which the surcharge is calculated, has been recorded.
- Cost Component
-
The cost component to which the surcharge is posted.
Note: You can only specify a cost component for which the Component Type is set to Detail or Collect in the Cost Components (tcmcs0148m000) session.