Material Costs (tpppc2111m000)

Use this session to maintain the material cost for a project.

Note: This session also displays the cost transactions that are not posted to Financials and the project history.

Field Information

Costs
Project

The project code.

Description

The description or name of the code.

Status

The status of the project.

Allowed values

Free
Active
Finished
Closed
Archived
Element

The code of the element linked to the project.

Description

The description or name of the code.

Work Authorization Status

The work authorization status of the element.

Activity

The activity code.

Description

The description or name of the code.

Work Authorization Status

The work authorization status of the activity.

Extension

The extension code.

Description

The description or name of the code.

Settlement Status

The status of the extension linked to the cost transaction.

Allowed values

Free
Actual
Final
Invoicing Allowed
Invoiced
Item

The code specified in the General Projects (tcmcs0552m000) session.

Description

The item description.

Note: 

You can select the item from one of these sessions:

  • Items - Project (tppdm0505m000) session or
  • Control Data (Material Lines) (tpptc1535m000) session.
Description

The description or name of the code.

Effectivity Unit

The code of the effectivity unit.

Description

The description or name of the code.

Cost Component

The cost component code.

Description

The description or name of the code.

Sequence

The sequence number.

Costs
Quantity

The quantity of the material.

Unit

The unit of measure in which the quantity is expressed.

Standard Cost

The standard cost specified for the material.

By default, this is the standard cost determined according to the price policy specified in the Item - Project (tppdm0105s000) session.

If you change the value of this field, the value for the Cost Amount field is calculated, using this formula:

cost amount = quantity * standard cost 

In case of a transaction posted from Financials to Project , the cost is determined on the basis of the amount that is still outstanding.

Currency

The currency code of the material cost.

Cost Amount

The total cost amount generated for the material. If you change the generated cost amount, the unit cost rate is adjusted by the application.

Home Currency

The cost amount in home currency. Click Rotate Currency to view the amount in the other currencies.

Currency

The code of the home currency. Click Rotate Currency to view the amount in the other currencies.

Currency Rate

The currency rate to convert the transaction currency to the home currency.

Rate Factor

The rate factor.

Text

The text related to the material cost.

Item Picture

The picture of the item, if any.

Sales
Sales Price

The sales price per unit code.

Currency

The project currency used to express the sales price.

Note: The contract line (CLIN) currency is the default currency used for the cost plus invoice lines. The sales price on the billable cost lines is calculated based on the CLIN currency using the sales rate defined for the contract lines.
Sales Amount

The total sales amount generated for the material.

If you change this amount, the value of the Sales Rate field is adjusted by the application, as follows:

sales rate = sales amount / no. of hours 
Home Currency

The sales amount in home currency.

Currency

The home currency code. Click Rotate Currency to see the amount in the other home currencies.

Billable

If this check box is selected, the transaction can be invoiced to the business partner.

Note: By default, this check box is selected, if the Invoice Type field in the Projects (tppdm6100m000) session is set to Cost-Plus and the Invoice Calculation Method field in the Extension (tpptc0110s000) session is set to Actual Costs.
Currency Rate

The currency rate to convert the transaction currency to the home currency.

Rate Factor

The rate factor.

Dates
Registration Date

The date when the material costs are registered.

Cost Control Period

The cost control year in which the material cost must be posted to project history.

/

The cost-control period in which the material cost must be posted to project history.

Fiscal Period

The Fiscal Period in which the transaction is posted to Financials.

Note: The default value for this field is the current fiscal year.
/

The Fiscal Period in which the transaction is posted to Financials .

Note: The default value for this field is the current fiscal year.
References
Reference
Buy-from Business Partner

The code of the buy-from business partner.

Name

The name of the buy-from business partner.

Invoice-from Business Partner

The invoice-from business partner for the material cost transaction.

Document

The code of the document that contains the material cost invoice details.

Enterprise Unit

The code that identifies the enterprise unit, responsible for the delivery that is specified on the transaction line.

Note: The enterprise unit can differ from the project enterprise unit, because you can have intercompany transactions.
Description

The description or name of the code.

Finance
Delivering Company

The delivery company to which the enterprise unit is linked.

Note: The value of this field is part of the financial document number.
Transaction Type Financial Transaction

The transaction type of the financial document.

Note: If a financial transaction is posted from Financials to Project , the document number is populated. You cannot maintain the value of this field in Project .
Document

The document number.

Note: If a financial transaction is posted from Financials to Project , the document number is populated. The document number cannot be maintained in Project .
Line Number

The line number of the financial document.

Note: If a financial transaction is posted from Financials to Project , the line number is populated. The line number cannot be maintained in Project .
Sequence Number Finance

The sequence number of the financial document.

Note: If a financial transaction is posted from Financials to Project , the sequence number is populated. The sequence number cannot be maintained in Project .
Transaction
Posting Type

The origin of the transaction and the accounts on which the transaction posted to Financials is based.

Allowed values

Project Control
Shipment Variance
Inventory
Purchase Invoice (Fin.)
Invoice (Purchase Order)
Price Variance
Expense Tax
Price Variance
Price Variance (Rev)
Service Cost
Transaction Time

The date and time when the material cost transaction is created.

User

The logon code of the user who created the material cost transaction.

Name

The name of the user who created the material cost transaction.

Status
Post to LN Financials

If this check box is selected, the material cost transaction is posted to Financials .

Note: The value is defaulted based on the Financials (TF) check box in the Implemented Software Components (tccom0100s000) session.
Approved for Posting

If this check box is selected, the transaction is processed to Financials , project history, or both.

Settlement Origin

If this check box is selected, the transaction is posted as a result of this fluctuation settlement.

Text

If this check box is selected, a text is present.