Costing Breaks - Service Material (tppdm3103m000)

Use this session to create and maintain the costing breaks for the field service and depot repair of Service items.

For a project involving field service and depot repair of Service item, you can create costing breaks for the material costs. You can create costing breaks for the service item group, installation group, main item, item, and the serial number mapped to specific element or activity of the project.

Note: To manually copy the costing breaks to another project, select the Copy to other Project option on the Actions menu. The Copy to Other Project window opens wherein you can specify the target project code.

Field Information

Project

The code that identifies the project for which the costing breaks are created.

Note: You can also create costing breaks for blank projects (projects for which the project code is not specified). However, you must specify the standard element/activity to create costing breaks.
Line

The line number of the costing break.

Service Item Group

The code of the service item group linked to the item in Service for which the costing break is created.

Note: This field is disabled if you specify a value in the Installation Group or the Main Item field.
Installation Group

The code of the installation group linked to the item in Service for which the costing break is created.

Note: This field is disabled if you specify a value in the Service Item Group field.
Main Item

The service item for which the costing break is created.

Note: This field is disabled if you specify a value in the Service Item Group field.
Item

The item in Service , for which the costing break is created.

Note: This field is disabled if you specify a value in the Service Item Group or the Installation Group the field.
Serial

The serial number of the serialized item in Service , for which the costing break is created.

Note: By default, this field is disabled. This field is enabled only if you specify a value in the Item field
Element

The element for which the costing break is created.

Note: You must specify the standard element and/or the standard activity for a blank project.
Description

The description or name of the code.

Activity

The activity for which the costing break is created.

Note: You must specify the standard element and/or the standard activity for a blank project.
Description

The description or name of the code.