Material Fluctuation Indices (tppdm0170m000)

Use this session to record the index values of a structural material (for example, steel) while a project is being carried out. The index table for material fluctuation settlement contains the price changes of the structural material in a fluctuation settlement. The table contains a range of index figures with the corresponding data. Depending on the situation, there can be different index tables for structural materials.

Field Information

Material

The structural material that the indices are recorded for. The item must be present as a standard or project item.

item.desc

The description or name of the code.

Index Table

The table containing the price changes for structural material. Some structural materials require the use of different index tables. The index table, in combination with the item, must be present.

Index Value Start Date

The date the index value becomes valid.

Index Value

The index figure which, from the corresponding start date, is valid for calculating the new amounts. This figure remains valid until the next start date is recorded in one of the lines in this table.

Description

The description or name of the code.