To merge estimate lines
You can merge multiple estimate lines into a single line using the Estimate Lines
(tpest2100m000) session for cost aggregation.
option in the Note:
- To access this session, you must use the Estimate Lines (tpest2100m000) session. option from the menu in the
- You can merge only the estimate lines for which the Estimate Type field is set to and the field is set to .
- Estimate lines with the field set to or cannot be merged.
You can use the Add/Replace tab to specify the cost type and structural elements for the merged estimate line. The net sales amount for the merged estimate line is calculated using the values specified on the Pricing Method tab. After you merge the estimate lines, a new estimate line is added with the net sales amount, which is calculated based on the pricing method specified in this session.