Indicating Task Relationships
This session enables you to:
- List and maintain data that concerns costing, operation time, and capacity for specific relationships between tasks, machines, and work centers.
- Have better visibility of resources during work preparation.
- Define default setup times, cycle times at the relationship level, and so on.
It is mandatory to define task relationships for a combination of task, work center, and/or machine if the following is true:
- The Work Center Selection Method field or the Machine Selection Method field in the Tasks (Reference Operations) (tirou0103m000) details session is Specific.
- The Type of Operation Rates field in the Standard Cost Calculation Parameters (ticpr0100m000) session is Task Relationship Rate.
If the Work Center Selection Method field in the Tasks (Reference Operations) (tirou0103m000) details session is All, the Work Center field in the Task Relationships (tirou0104m000) session can be left empty to produce generic task relationships. The same goes for machines: If the Machine Selection Method field the in the Tasks (Reference Operations) (tirou0103m000) details session is All, the Machine field in the Task Relationships (tirou0104m000) session can be left empty.
Specific menu
On the appropriate menu you can click:
Default value
The defaults entered in this session are used in the Routing Operations (tirou1102m000) session and are retrieved when you enter an operation.