Operation Planning Example
Effect on previous operations example
When moving operation 30 of the following operation structure, operations 10 and 20 are affected by the moving method previous operation field.
The moving method for operations is not taken into consideration when shifting the production planning by means of the Production Orders (tisfc0501m000) session or the Shift Production Planning (tisfc1202m000) session. The moving method is only used when shifting on the operation level in the Production Planning (tisfc0110m000) details session.
Effect on subsequent operations example
When moving operation 30 of the following operation structure, operations 40, 50, and 60 are affected by the moving method next operation field:
The moving method for operations is not taken into consideration when shifting the production planning by means of the Production Orders (tisfc0501m000) session or the Shift Production Planning (tisfc1202m000) session. The moving method is only used when shifting on the operation level in the Production Planning (tisfc0110m000) details session.