tirou domains
- Company
-
Based on the calendar values entered for the company in question, the system calculates the available capacity in the Calendars and Periods module.
- Work Center
-
Based on the calendar values entered by work center, LN calculates the available capacity in the Calendars and Periods module.
- Automatic
-
If this option is selected, the Lead Time field in the Job Shop Routing (tirou4600m000) session is disabled. If you edit the Time Unit field in the Job Shop Routing (tirou4600m000), the lead time for the routing is recalculated.
- Manual
-
If this option is selected, you can set the lead time using the Lead Time field in the Job Shop Routing (tirou4600m000) session.
- Setup
-
The machine is ready for manufacture.
- Not Applicable
- Run
-
A production order manufacture run is active.
- Interrupted
-
A production order run has been interrupted.
- Down
-
The machine is down for maintenance or repair.
- Free
-
The machine is free to be assigned production orders for manufacture.
- Add and Renumber
-
The copied routing data is added to the target routing.
Note: LN uses incremental steps equal to 10 when copying routing information. - Overwrite
-
The copied routing data overwrites the routing data of the target routing. Only the operations within the selected range are overwritten.
- Hour
-
The production rate is expressed in hours.
- Minute
-
The production rate is expressed in minutes.
- New
- Approved
- Expired
- Primary
- Secondary
-
the work center is not a shared work center.
- Quantity
-
A routing operation is started when a specific quantity of items is finished on the preceding operation.
- Percentage
-
A routing operation is started when a specific percentage of items is finished on the preceding operation.
- Work Center
-
If this value is selected the Work Centers report is printed.
- Parent Work Center
-
If this value is selected the Work Centers by Main Work Center report is printed.
- Work Center Type
-
If this value is selected the Work Centers by Work Center Type report is printed.
- Shared Work Center Type
-
If this value is selected the Work Centers by Shared Work Center Type report is printed.
- Planning
- Requisition
- Manual
- Not Applicable
- Internal
- Customer
- Not Applicable
- Scan to Book
- If this option is selected, labels are printed before production starts. Handling units are generated with the labels. The produced quantities completed must be reported through handing units. This can be done with a scanner or manually.
- During Warehouse Receipt
- If this option is selected, handling units and labels are generated sequentially upon receipt confirmation of goods in the warehouse.
- Report Order
- If this option is selected, labels are printed at the Report Orders Completed process. The reporting is done on quantities.
- Not Applicable
- Infor LN
- If this option is selected, Infor LN is used for printing the labels.
- External Application
- If this option is selected, the publication of the PackageLabelBOD is triggered so that an external application can print labels.
- Not Applicable
- If this option is selected, the labels are note printed.
- Preventive
- Breakdown
- Phase-in
- Phase-out
- Current Revision
- If this option is selected, the print includes the routings and routing operations from the approved revisions that are currently effective.
- By Date
-
If this option is selected, the print includes the approved routings and routing operations with effective revision based on the specified date.
By default, the value is displayed as the current date.
- Status
- This option defines the range of routing operation status (New, Approved, Expired) to be included in the print.
- Setup Time
- Cycle Time
- Number of Machines
- Labor Resources for Setup
- Labor Resources for Production
- Queue Time
- Wait Time
- Move Time
- Percent
- FTE
- Minutes
- Hours
- Days
- Machines