tirou domains

Company

Based on the calendar values entered for the company in question, the system calculates the available capacity in the Calendars and Periods module.

Work Center

Based on the calendar values entered by work center, LN calculates the available capacity in the Calendars and Periods module.

Automatic

If this option is selected, the Lead Time field in the Job Shop Routing (tirou4600m000) session is disabled. If you edit the Time Unit field in the Job Shop Routing (tirou4600m000), the lead time for the routing is recalculated.

Manual

If this option is selected, you can set the lead time using the Lead Time field in the Job Shop Routing (tirou4600m000) session.

Setup

The machine is ready for manufacture.

Not Applicable
Run

A production order manufacture run is active.

Interrupted

A production order run has been interrupted.

Down

The machine is down for maintenance or repair.

Free

The machine is free to be assigned production orders for manufacture.

Add and Renumber

The copied routing data is added to the target routing.

Note: LN uses incremental steps equal to 10 when copying routing information.
Overwrite

The copied routing data overwrites the routing data of the target routing. Only the operations within the selected range are overwritten.

Hour

The production rate is expressed in hours.

Minute

The production rate is expressed in minutes.

New
Approved
Expired
Primary
Secondary
None

the work center is not a shared work center.

Quantity

A routing operation is started when a specific quantity of items is finished on the preceding operation.

Percentage

A routing operation is started when a specific percentage of items is finished on the preceding operation.

Work Center

If this value is selected the Work Centers report is printed.

Parent Work Center

If this value is selected the Work Centers by Main Work Center report is printed.

Work Center Type

If this value is selected the Work Centers by Work Center Type report is printed.

Shared Work Center Type

If this value is selected the Work Centers by Shared Work Center Type report is printed.

Planning
Requisition
Manual
Not Applicable
Internal
Customer
Not Applicable
Scan to Book
If this option is selected, labels are printed before production starts. Handling units are generated with the labels. The produced quantities completed must be reported through handing units. This can be done with a scanner or manually.
During Warehouse Receipt
If this option is selected, handling units and labels are generated sequentially upon receipt confirmation of goods in the warehouse.
Report Order
If this option is selected, labels are printed at the Report Orders Completed process. The reporting is done on quantities.
Not Applicable
Infor LN
If this option is selected, Infor LN is used for printing the labels.
External Application
If this option is selected, the publication of the PackageLabelBOD is triggered so that an external application can print labels.
Not Applicable
If this option is selected, the labels are note printed.
Preventive
Breakdown
Phase-in
Phase-out
Current Revision
If this option is selected, the print includes the routings and routing operations from the approved revisions that are currently effective.
By Date

If this option is selected, the print includes the approved routings and routing operations with effective revision based on the specified date.

By default, the value is displayed as the current date.

Status
This option defines the range of routing operation status (New, Approved, Expired) to be included in the print.
Setup Time
Cycle Time
Number of Machines
Labor Resources for Setup
Labor Resources for Production
Queue Time
Wait Time
Move Time
Percent
FTE
Minutes
Hours
Days
Machines