tirpt domains

Confirm

Sets the order status from Planned to Confirmed. You can only do this if the order type is INA or RRP.

None

No Help topic is associated with this item.

Release

Sets the order status to Released. You can only do this if the order type is JSC.

Report

Sets the order status to Completed.

Transfer

Sets the order status to Planned. You can only do this if the order type is INA or RRP. The order type becomes JSC.

At Reporting Complete
At Completing Shift
At Closing Work Cell Cost Document
Manual
Day
Not Applicable
Week
4 Weeks
Month
Amount per labor hour

The surcharge is expressed as a fixed amount per work hour. The duration of the shifts and work days influences the total surcharge.

Amount per Work Cell hour

The surcharge is expressed as a fixed amount per work cell hour. The availability of the work cell influences the total surcharge.

Fixed amount per shift

The surcharge expressed as a fixed amount per shift. The amount can be positive or negative and is not influenced by the duration of the shift.

None

You do not report the operation as complete. The operation status is not changed.

All in Period

You report the operation as complete for the quantities that are equal to or greater than the minimum quantity that can be reported as complete.

Manual

You have to manually report the schedule line competed in the Report Shift (tirpt4636m200) session.

Automatic

Schedule line status is set to completed, when ordered quantity is reached.

Open

Costs can be added to the cost document.

Closed

Costs can no longer be added to the cost document.

Initial

The cost document has been generated, but no costs have been added.

Estimated
Registered
Actual Initialized
Actual Approved
Posted to People
Based on Production Schedules
Based on Start Dates
On Schedule
Early
Lagging
Planning

The production run is scheduled using Enterprise Planning .

Manual

The production run is scheduled manually.

Free

Run schedule is controlled by the planning engine.

Firm
  • The production schedule lines with the status Firm can be replanned only by using the Move Schedule (tirpt4202m000) session and not by the Enterprise Planning or other planning engines.
  • Production Schedule Lines with a status of Firm can be locked from replanning or moving by planning engines such as Enterprise Planning.
Released

Run schedule complete, changes can only be made manually.

Active

Production run schedule is being implemented.

Production Completed

All schedule lines for the production run were completed, but the run has not been closed.

Completed

All schedule lines for the production run were completed, and all completed products were delivered into inventory. You can still account hours and issue materials for the run schedule.

Closed

The run schedule was completed, changes can no longer be made.

Canceled
The production schedule lines with status Released can be canceled.
Not Applicable
In Repair

The items is being reworked at the repair cell.

Sent to Warehouse

The item was repaired and is send to the warehouse specified in the original schedule line instead of being returned to the line.

Note: Warehouse orders are not updated or activated. When the repair schedule line is completed, the related warehouse order lines are deleted.
Sent Back to Work Cell

The item was repaired and will be returned to the schedule line it was rejected from.

Note: It is not possible to send a repaired item back to the schedule line if the line was reported completed.
Set Up
Run
Down
Wait
Single-Product

Used to maintain production models for the manufacture of a single end item.

Multi-Product

Used to maintain production models for the manufacture of multiple end items in different quantities.

Item

The production schedules are directly connected to a repetitive item.

Scheduling Area

The production schedules are connected to a repetitive item via the scheduling area and the routing of the item.

Planned

All production order data can still be changed.

Order Documents Printed

The documents that accompany the production order are printed.

Released

The production order is released for production.

Active

Work on the production order has started.

To be Completed

The order is reported with the Completed status.

Completed

The order is reported with the Completed status and all completed products are delivered to inventory.

Preventive
Breakdown
Phase-in
Phase-out
RRP

An order that originates from the Enterprise Planning package.

SIC

An order that originates from the Warehousing package.

JSC

An order that originates from the Job Shop Control module.

Open

The shift is still in progress, work is being done on the work list in the Work List (tirpt4602m000) session.

Completed

The shift has ended.

Closed

The shift has ended, backflushing has taken place and cost documents are closed.

In Stock
The material shortage or availability check is performed based on the On Hand quantity.
Planned Available
The material availability or shortage check is performed based on the Planned Receipts quantity.
Supply Warehouse
The check for material shortage or availability includes the main Warehouse and Point of Usage (POU).
Note: POU must be included in the Enterprise Planning.
Warehouses in Site
The check for material shortage or availability includes all Warehouses with or without EP check.
Note: To exclude Warehouses without EP, you can select the Planned Warehouse Only check box.
Warehouses in Cluster
The check for material shortage or availability includes all Warehouses that are linked to the same Cluster, with or without EP check.
Note: To exclude Warehouses without EP, you can select the Planned Warehouse Only check box.
Show Items with Shortage
Only Items with a shortage are displayed.
Show all Items
All Items with and without shortage are displayed.
By Line
The materials shortage check is performed based on each Production Schedule Line.
By Run
The materials shortage check is performed based on Production Schedule Lines that have the same Run ID.