Import Bill of Material to Subcontracting Model (tisub1210m000)
Use this session to import and convert a bill of material from Job Shop to a subcontracting bill of material for item subcontracting.
Field Information
- Product
-
The subcontracted item.
- Subcontractor
- Subcontractor Site
-
The ID of the subcontractor site where production takes place.
- Ship-from Business Partner
-
The business partner who ships the subcontracted part.
- Revision
-
The revision ID.
- Site
-
The site ID.
Note: Only visible if multisite functionality is active. - Reference Date
-
The date from which the bill of material is valid.
- Position
-
The component's position number.
- Material Item
- Net Quantity
-
The number of items on the BOM line that is required to manufacture the product.
- Scrap Percentage
-
Recording a scrap factor prevents shortages in production. The scrap factor is expressed as a percentage loss.
A scrap factor of 5% means that LN will allocate 5% more of a component for a production order (gross material requirement).
Scrap is an extra loss in addition to the loss caused by the yield being less than 100%.
If you generate the BOM from an engineering BOM, the scrap factor and scrap quantity values will also be copied. However, these values will only be copied if the sequence number is the only thing changed, for example, wheel 10/1 to wheel 10/2. If there is a new item on the BOM line, for example, wheel to spare wheel, the scrap data will not be copied. In this case, the scrap quantity and scrap factor will be zero (0).
- Effective Date
- Expiry Date
- Phantom Item