Subcontracting Models (tisub1100m000)

Use this session to manage models for subcontracting products or intermediate products.

Field Information

Product

The subcontracted item.

Subcontractor

subcontractor

Subcontractor Site

The ID of the location where the subcontracted production takes place.

Ship-from Business Partner

The business partner who ships the (intermediate) product.

Revision

The revision ID.

Production Site

The site ID.

Effective Date

The date and time the subcontracting model is valid.

Expiry Date

The date and time the subcontracting model is no longer valid.

Status

The status of the subcontracting model.

Allowed values

New
Approved
Expired
Use BOM Units

Indicates if using BOM unit is applicable for material lines.

Note: 
  • By default, this check box is cleared.
  • This check box is enabled only if:
    • The Status of the Production Bill of Material is New.
    • The BOM Units of Material lines check box is selected in the Product Engineering Parameters (timfc0100m000) session
Capacity / Week

The weekly capacity of the subcontracting location. This value is used in planning to analyze the availability of the subcontractor.

Available for Planning

If this check box is selected, the subcontracted model is available to be used in planning.

Use for Planning

If this check box is selected, the subcontracting model is used for planning.

Use for Costing

If this check box is selected, the subcontracting model is enabled for costing, and for use in the calculation of the standard cost of a subcontracting item.

Subcontractor Warehouse

The warehouse where the component is stored and where the allocation for a production order is made.

Note: If the component is a phantom, and you select the Inherit Warehouse if Parent Item is a Phantom check box, LN allocates the requirement for the component in the warehouse of the component's parent item.
Subcontracting Cluster

The planning cluster to which the subcontractor belongs.

BOM Quantity

BOM quantity

Supply Order Method

Indicates if the supply orders must be created as purchase order or as purchase schedule.

Note: 
  • This field is displayed only if the Schedules check box is selected in the Procurement Parameters (tdpur0100m000) session, and Sites is set to Active in the Implemented Software Components (tccom0100s000) session.
  • By default, the value is set to Purchase Order.
  • Purchase Schedule is visible only if the Purchase Schedule in use check box is selected in the Items - Purchase (tdipu0101m000) orItems - Purchase by Site (tdipu0181m000) session.

Allowed values

Purchase Order

Purchase Schedule

Purchase Contract

The code of the purchase contract.

Note: This field is displayed only if the Supply Order Method is set to Purchase Schedule.
Purchase Contract Line

The purchase contract line number.

Note: This field is displayed only if the Supply Order Method is set to Purchase Schedule.
Source

The source of the subcontracting model.

Allowed values

Manual

The P-BOM is defined in the Production Bills of Material (timfc3100m000) session.

Production Bill of Material

The P-BOM revision was generated from an existing production bill of material.

Engineering Bill of Material

The P-BOM is generated from an engineering bill of material.

Note: If the P-BOM is generated from an E-BOM, the Source Engineering Item and Source Revision fields are filled.
PLM

The P-BOM is generated from data imported from PLM.

Configurator (PCF)

The P-BOM is generated from data imported from the PCF configurator.

Configurator

The P-BOM is generated from data imported from Infor Configurator.

Job Shop Bill of Material

The P-BOM was generated from a job shop bill of material.

Not Specified
Source Revision
The PBOM revision from which the JSBOM revision was generated.
Lead Time Type

Specify the type of lead time used for the subcontracting model.

Allowed values

  • Fixed
  • Proportional
Fixed Supply Time

If the lead time type is Fixed, the supply time does not depend on the ordered quantity.

Supply Time

If the lead time type is Proportional, the supply time needed per unit. The supply time will increase with the number of units.

Actual Calendar

The actual calendar used by the subcontracting model.

Origin
The ID of the session where the actual calendar is defined.
Created On

The date the selected subcontracting model was created.

Created By

The employee who created the selected subcontracting model.

Approved On

The date the selected subcontracting model was approved for use.

Approved By

The employee who approved the selected subcontracting model for use.

Expired On

The date the selected subcontracting model was expired and could no longer be used.

Date Adjusted On
The date and time when the expiry date of the revision is last modified.
Date Adjusted By
The logon code of the user who last modified the expiry date of the revision.
Expired By

The employee who expired the selected subcontracting model.