Working with the Subcontractor 360 (tisub0330m000) session
The subcontract locations are shown per production site.
For a subcontractor selected from the list, the check boxes in the Models, Planning, and Orders group boxes indicate if related data is maintained. You can click the entity to access the corresponding session, wherein you can view and maintain the related data.
You can also select a subcontractor from the list to view the order statuses related to the subcontractor in the Purchase Order Status donut.
Field Information
- Planning Cluster
-
The planning cluster for which you want to display the subcontractor locations or production sites.
- Production Site
-
The ID of the site where the subcontracting work is performed.
Note:This filter is optional.
If no production site is selected, the default production site specified in the production user profile is used.
- Model
-
- Location
-
If this check box is selected, subcontractor locations are present.
Click on the link to open the Subcontractor Location (tisub0625m000) session.
- Operation Subcontracting
-
If this check box is selected, operation subcontracting is active for the selected planning cluster and production site.
Click on the link to open the Operation Subcontractors List (tisub2100m000) session.
- Product Subcontracting
-
If this check box is selected, product subcontracting is active for the selected planning cluster and production site.
Click on the link to open the Product Subcontractors List (tisub1100m000) session.
- Planning
-
- Resource Capacity
-
If this check box is selected, resource capacity is present at the selected subcontractor site.
Click on the link to open the Resource Capacities (cprpd2602m000) session.
- Orders
-
- Subcontracted Operations
-
If this check box is selected, subcontracted operations are present for the selected subcontractor site.
Click on the link to open the Subcontracted Operations (tisfc2110m000) session.
- Purchase Orders
-
If this check box is selected, the purchase orders for the subcontractor and site are displayed.
Click on the link to open the Purchase Order Intake Workbench (tdpur4601m200) session.
- Subcontractor
-
The subcontractor ID.
- Subcontractor Cluster
-
The planning cluster to which the subcontractor site belongs.
- Subcontractor Site
-
The ID of the site that belongs to the subcontractor.
- Production Site
-
The ID of the site for which subcontracting is done.
- Transportation Time Method
-
The method by which the transportation time is defined is:
Allowed values
- Derived
- Manual
- Not Applicable
- Ship-to Carrier
-
The carrier responsible for the transport of the intermediate product or materials to the subcontractor.
- Transportation Time To
-
The time needed to transport the intermediate product or materials to the subcontractor site.
- Time Unit To
-
The time unit in which the transportation time is expressed is:
Allowed values
- Hours
- Days
- Ship-from Carrier
-
The carrier responsible for the transport of the subcontracted item from the subcontractor.
- Transportation Time From
-
The time needed to transport the (intermediate) product to the subcontractor site.
- Time Unit From
-
The time unit in which the transportation time is expressed is:
Allowed values
- Hours
- Days