Work Center Utilization by Day (tisfc1506m000)
Use this session to display an overview of capacity utilization of a work center for one day. You can see, for each order, the time and quantity that it is planned.
Reports
By selecting Print from the
menu, you can start the following sessions:- Print Work Center Utilization by Day (tisfc1403m000).
- Print Shared Work Center Utilization by Day (tisfc1406m000), if the work center is a secondary work center that is linked to a primary work center and the secondary work center is in the same logistic company as the primary work center.
Field Information
- Work Center
-
The work center for which you want to see a summary of what capacity requirements are planned for that day.
To see utilization for a shared work center, use the Shared Work Center Utilization (tisfc1510m000) session.
- Description
-
The work center for which you want to see a summary of what capacity requirements are planned for that day.
To see utilization for a shared work center, use the Shared Work Center Utilization (tisfc1510m000) session.
- Site
-
The site ID.
Note: Only visible if multisite functionality is active. - Total Hours
-
The total available capacity (hours) of employees working at the work center for the selected day.
- Total Hours Machine
-
The total available capacity (hours) of the machine working at the work center for the selected day.
- Production Date
-
The day for which you want to see a summary of what capacity requirements are planned.
- Normal Man Capacity
-
The normal capacity for the selected employee.
- Normal Machine Capacity
-
The normal capacity for the selected machine.
- Available Capacity
-
The available capacity (hours) of the employee working at the work center for the day in question.
- Available Capacity
-
The available capacity (hours) of the machine working at the work center for the day in question.
- Start Time
-
The start of the period for which you want to see what capacity has been planned.
- Production Order
-
The code of the planned production order.
- Routing
-
Note: If no routing is displayed, there are no estimated production costs defined for the production order.
- Operation
-
The code of the operation planned for the work center.
- Operation Status
-
The progress of the operation.
Allowed values
- Planned
-
The status when the plan is created.
- Ready to Start
-
When there is enough Quantity Completed on all the previous operations to report complete the minimum order quantity of the operation in the Report Operations Completed (tisfc0130m000) session, the operation status is set to Ready to Start by the previous operation.
- Started
-
If you use LN the operation status is Started when any quantity is reported as completed in Job Shop Control .
- Active
-
A WIP transaction has been performed on this operation. When the first operation is set to Active, the order status becomes Active too.
- Blocked
-
The operation has been blocked in Job Shop Control by the user or by an inspection order. Refer to Blocking operations.
- Completed
-
All the work has been completed for the operation. The quantities reported as completed and rejected are final. You can set this status in the Report Operations Completed (tisfc0130m000) details session. If required, you can click in the Report Operations Completed (tisfc0130m000) details session to change the operation status from Completed back to Active.
- Closed
-
The financial results of the operation have been calculated. Operations can only be closed in LN.
- Task
- Machine
-
The machine with which the operation is carried out.
- Labor Hours
-
The man hours needed to carry out the operation
- Machine Hours
-
The machine hours needed to carry out the operation
- Quantity Planned
-
The quantity of items you plan to produce in this operation on this date, including items lost to scrap and low yield.
- Physical Location
-
The location where the order is processed.
- Production Order Group
-
The group of orders to which the order belongs.
- Item
-
The item produced in the operation.
- Initial Hidden
-
- Queue Time
-
The queue time is used in lead time calculation. The queue time is expressed in days or hours. The days or hours must be interpreted as days and hours in the working time calendar that is linked to the work center.
If the Time Unit field is Days, LN rounds the entered values of the lead times to integer values.
- Wait Time
-
The wait time of the operation as you defined it in the Routing Operations (tirou1102m000) session, expressed in the time unit you specified in that same session.
- Move Time
-
If the Time Unit field is Days, LN rounds the entered values of the lead times to integer values.
- Cycle Time (min)