Production Order Parameters (tisfc0100s000)
Use this session to maintain the parameters of the Job Shop Control module.
Field Information
- General
-
- Effective Date
-
The date and time that the parameters were changed. The parameters are valid up to the effective date of a more recent parameter setting. The current set has no effective date.
- Description
-
The description of the parameter set. The default is the description of the previous parameter set. To avoid confusion you must always delete the default and add a new text.
- Number Group
-
- Number Group for Order Grouping
-
The number group in which the series for order group numbers are defined. Order groups are defined in the Create Production Order Group (tisfc3250m000) session.
Allowed values
Number groups are defined in the Number Groups (tcmcs0151m000) session. You cannot select a number group that is already in use. The number group must be of the Production type.
- Production Order Series for Order Grouping
-
The default series that is used to generate order group numbers in the Create Production Order Group (tisfc3250m000) session.
- Number Group for Production Orders
-
The number group in which the series for production order numbers are defined.
Allowed values
The number group must be defined in the Number Groups (tcmcs0151m000) session.
- Production Order Series for Production Orders
-
The default production order series that is used to generate production order numbers if you insert a production order manually in Job Shop Control .
- Production Order Series for Enterprise Planning
-
The default production order series that is used by Enterprise Planning when transferring orders to the execution level of LN.
- Production Order Series for Warehousing
-
The production order series that is used to generate a production order in Job Shop Control for a production-order advice in the Production Order Advice (whina3100m000) session.
- Capacity Overview
-
- Update Method Day Utilization
-
Select the method by which you want to rebuild day utilization, that is, to recalculate how much capacity per day is planned for work centers, machines, and so on.
Note: Not applicable if the Job Shop by Site parameter in the Concept Activation (tcemm4600m000) session is set to Active.Allowed values
- Automatic
-
The capacity is recalculated when you click Rebuild Capacity Utilization from the Utilization by Week (tisfc1502m000) session or the Utilization by Day (tisfc1503m000) session, or when the planning of orders is adjusted.
- Manual
-
The capacity is recalculated when you run the Build Utilization (tisfc0201m000) session.
- Not Implemented
-
The capacity is not recalculated.
- Update Method Week Utilization
-
Select the method by which you want to rebuild week utilization, that is, to recalculate how much capacity per week is planned for work centers, machines, and so on.
Note: Not applicable if the Job Shop by Site parameter in the Concept Activation (tcemm4600m000) session is set to Active.Allowed values
- Automatic
-
The capacity is recalculated when you click Rebuild Capacity Utilization from the Utilization by Week (tisfc1502m000) session or the Utilization by Day (tisfc1503m000) session, or when the planning of orders is adjusted.
- Manual
-
The capacity is recalculated when you run the Build Utilization (tisfc0201m000) session.
- Not Implemented
-
The capacity is not recalculated.
- Utilization
-
If this check box is selected, utilization data is generated automatically at the specified interval.
You can also generate utilization data using the Generate Machine and Labor Utilization (tisfc0260m000) session.
- Update Method I/O Control
-
The method for input/output control.
Allowed values
- Day
-
When you generate input/output control data, the time bucket is one day. The start of the day is 00:00:00 and the end of the day is 23:59:59.
- Not Implemented
-
Input/output control is not implemented and relevant sessions are disabled. This is the default setting.
- Week
-
When you generate input/output control data, the time bucket is one week. The week start day is the company start day.
- No. of Periods to Generate I/O Data
-
The period for which a work center's capacity and input/output values are calculated. Dependent on the value in the Update Method I/O Control field, the period is expressed in days or weeks.
Note: If you selected Not Implemented in the Update Method I/O Control field, you cannot enter a value in this field. - Include Partial Completions (Default)
-
If this check box is selected, LN also takes into account the routing operations that are reported only partially completed to calculate the input/output values.
If this check box is cleared, LN only takes into account the routing operations that are reported entirely completed to calculate the input/output values.
You can select the Include Partial Completions (Default) check box if work centers are used for orders with extremely long lead times.
The setting of the Include Partial Completions (Default) check box works as a default for the Include Partial Completions (Default) check box in the Generate Work Center Input/Output Control (tisfc3210m000) session and the Generate Machine Input/Output Control Data (tisfc3220m000) session.
- Revisions
-
- Engineering Revisions Active
-
If this check box is selected, you can use revisions of items.
Note: You must also select the Engineering Revisions check box in the Implemented Software Components (tccom0100s000) session. - Combine Warehouse Orders End Item
-
If you report an end-item quantity as completed, you can choose to receive the end items in the warehouse immediately, or in a later stage. Usually, for every quantity that is received in the warehouse, a production warehouse order line is generated. If you receive the end items in the warehouse in a later stage, you can use this check box to combine production warehouse order lines, which limits database growth.
If this check box is selected, and you do not immediately receive the completed quantities in the warehouse, production warehouse order lines for the completed end-item quantities are combined into one production warehouse order line. As a result, the number of receipt transactions and variance transactions is reduced.
If this check box is cleared, and you do not immediately receive the completed quantities in the warehouse, a production warehouse order line is created for every completed quantity.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Combine production warehouse order lines.
- Text
-
- Operation Text
-
Indicate the action to be performed to update the text for a routing operation.
Allowed values
- Copy from Routing Operation
- The text linked to the routing operation in the Routing Operations (tirou1102m000) session is copied to the production order in the Production Planning (tisfc0110m000) session. You can add or modify the routing operation text that is copied to the production order operation.
- Link Routing Operation Text
- The routing operation text in the Routing Operations (tirou1102m000) session is linked to the production order in the Production Planning (tisfc0110m000) session. You can specify operational text manually only after removing the link from the routing operation.
- Material Text
-
Indicate the action to be performed for the Material line text of a new Production Order.
Allowed values
- Copy from Bill of Material
- The text from the Job Shop List of Material (tibom3110m000) session is copied to the Estimated Materials (ticst0101m000) session (which is part of the Production Order (tisfc0101m100) session). This option can be used when the text is expected to be changed on the production order.
- Link Bill of Material Text
- The text from the Job Shop List of Material (tibom3110m000) session is linked to the Estimated Materials (ticst0101m000) session. You can specify a new text on the production order, only after removing the link to the Job Shop BOM text.
- Planning
-
- Automatic Update Production Order Start Date
-
If this check box is selected, the production order start dates are automatically updated when the start or finish dates of the operations are modified. The production start date of the production order is then equal to the start date and time of the first operation's queue time.
This parameter only applies to the Production Start field.
- Max. No. of Queue Time Compression Iterations
-
The number of times that LN repeats the queue time compression process until the production can be completed within the modified production order dates.
This parameter only applies if you selected the Best Fit method for queue time compression in the Automated Queue Time Compression (tisfc1103s000) session.
- Operation Numbering
-
- Initial Value for Renumbering Operations
-
The operation number assigned to the first phantom routing operation that is added to the main item routing.
Default value
The default value is 100.
- Step Size for Renumbering Operations
-
The number by which each subsequent operation number is increased when phantom routing operations are added to the main item routing.
Default value
The default is 10.
- On Order Date Production Orders based on
-
- -If Finish Date last Operation before order's Requested Delivery Date
-
The value of this field determines on which date the planned inventory transaction for a production order is based if the production order is expected to be delivered on time.
Note: The order is expected to be on time if the earliest finish date for the latest operation of the production order occurs before the delivery date for the production order.Allowed values
- Requested Order Delivery Date
-
The date on which the customer has requested delivery. LN equals the latest finish date of the latest operation with the Requested Order Delivery Date.
- Planned Order Delivery Date
-
The (re)planned delivery date of the production order. This date equals the earliest finish date of the latest operation.
- -If Finish Date last Operation after order's Requested Delivery Date
-
The value of this field determines on which date the planned inventory transaction for a production order is based if the production order is expected to be delivered late.
Note: The order is expected to be late if the earliest finish date for the latest operation of the production order occurs after the delivery date for the production order.Allowed values
- Requested Order Delivery Date
-
The date when the order is created.
- Planned Order Delivery Date
-
The (re)planned delivery date of the production order.
- Reporting Complete
-
- Reporting Method for Previous Operations
-
This parameter determines what happens if you report a quantity as complete for an operation, and the previous operation is not reported as complete yet.
You report orders as complete in the following sessions:
- Report Orders Completed (tisfc0520m000)
- Report Orders Completed Globally (tisfc0206m000)
Allowed values
- Automatic
- Interactive
- None
- Quantities Reported on Previous Operations
-
This parameter determines when completed quantities on operations are reported.
- If Completed and Rejected is selected, both quantities completed and rejected are reported for each previous operation.
- If Completed is selected, the quantity completed will only be updated. The rejected quantity is not updated and must be reported on each individual operation.
Note: Rejected quantities are always reported on the operation. When the option Completed is selected, quantities rejected are frozen when the quantity completed is updated.Example
Operation setting of Report Product in Report Operations Completed (tisfc0130m000) is set to:
- Automatic for operation 10
- Manual for operation 20
The Quantities Reported on Previous Operations field in the Production Order Parameters (tisfc0100s000) session is set to Completed.
Quantities reported:
- Rejects individually per operation
- Completed are reported for operation 20 only, this updates the completed for operation 10.
Allowed values
- Completed and Rejected
- Completed
- Allow correcting Operations in Report Orders / Reset Status
-
If this check box is selected, the and commands become available in the Report Orders Completed (tisfc0120s000) session and the command in the Reset Production Order Status (ticst0203m000) session.
- Calculation Method Remaining Production Time
-
This parameter determines how the remaining production time is calculated if the production has already started.
If a production order operation is a fixed duration operation, the remaining production time is always calculated based on time spent, because in that case operation lead times are not calculated by using operation quantities.
Allowed values
- Planned Quantity
-
The remaining production time is based on the quantity of the item that must still be processed.
- Time Spent
-
The remaining production time is based on the original production time minus the hours booked on the production order.
- Use Reason Codes for Rejected Items
-
Specifies if and when you must enter a reason code if you reject items when reporting operations complete.
Allowed values
- Optional
-
If this value is selected giving a reason code at rejection of an item is optional.
- Mandatory
-
If this value is selected giving a reason code at rejection of an item is mandatory.
- Never
Default value
The default value is Never.
- Adjust Planned Receipt for Scrap
-
Specify when the planned output of an operation is updated after a quantity of items is scrapped.
Note: If Immediately is selected the planned output quantities are adjusted as soon as output is scrapped. This may cause a higher frequency of changes in the planning.Allowed values
- Immediately
- At Operation Completed
- Post to Inventory when Reporting on Last Operation
-
The parameter determines whether the main item must be posted to inventory or not, after the last operation is reported as complete.
In the Report Operations Completed (tisfc0130m000) session the operations are reported as complete.
Allowed values
The field has following values:
-
Yes
When the last operation is reported as complete the main item is automatically posted to inventory. -
No
The main item is not posted to inventory. -
Interactive
You are asked whether the main item must be posted to inventory or not. You must select the option either yes or no.
Default value
The default value is Interactive.
-
- Label Layout for Printing Labels
-
If you print labels for completed production orders, the label layout entered in this field determines the format of the labels.
To print labels for production orders, the Print Labels check box in the Report Orders Completed (tisfc0520m000) details session must be selected if you report the production order as complete.
For repetitive manufacturing, the Print Label during Report Orders Completed check box in the Report Production Orders Completed from Production Schedule (tirpt1502m000) session, or the Print Label during Report Orders Completed check box in the Report Production Schedules Completed (tirpt1201m000) session must be selected.
- Device for Printing Labels
-
The printer where you print the labels for completed production orders.
- Allow Alternative Package Definition
-
If this check box is selected, the application allows you to use an alternative package definition when products are reported complete.
Note:- By default, this check box is cleared.
- This check box is displayed only if the Job Shop by Site field is set to Active in the Implemented Software Components (tccom0100s000) session.
- Materials/Hours
-
- Sorting Method Components
-
The value of this field determines how the components that are included in the materials estimate from the bill of material (BOM) are sorted in the Estimated Materials (ticst0101m000) session.
Note: This sorting order is especially important if you use phantoms.Allowed values
- Item
-
All components are sorted by item code.
- Operation and Item
-
The components are first sorted by operation (at the highest level) and, subsequently, by item code.
- Pos. Highest BOM Level
-
The components are sorted on the basis of the position numbers from the BOM of the main item.
- Own BOM Position
-
The position numbers from the BOM of the components are used for sorting purposes.
- Use of Shop Floor Warehouses
-
If this check box is selected, materials for production orders are issued from the job shop warehouse of the work center.
If this check box is cleared, materials are issued directly from the warehouse defined in the bill of material.
- Manual Issuing
-
If this check box is selected, the materials must be issued by a manual action. If you select this check box, you will have more control over the timing of the material issues.
Note: The value of this parameter does not affect materials that are issued by backflushing or materials that are held as floor stock. - Issue Material from Shop Floor Wh of Calc Office If No Operation
-
If materials are not linked to operations because no operations exist for the production order, you must determine from which warehouse the materials are issued:
- The warehouse that is specified in the BOM
- The job shop warehouse that is related to the production order's calculation office.
If this check box is selected, materials are issued from the job shop warehouse that is related to the production order's calculation office. If no job shop warehouse is found, the BOM warehouse is taken.
If this check box is cleared, materials are issued from the warehouse that is specified in the Estimated vs. Actual Material Costs (ticst0501m000) session. The default warehouse for this is usually the one that is maintained in the BOM.
- Create Back Order for Warehousing Transfer Orders
-
If this check box is selected, and insufficient inventory is available to execute the transfer order to transfer materials to the job shop warehouse, LN creates a back order to transfer the materials later. If this check box is cleared, and insufficient inventory is available to execute the transfer order to transfer materials to the job shop warehouse, you must manually initiate the transfer of the remaining material quantity when that material becomes available.
The setting of this check box is the default for the Create Backorders check box in the Outbound Order Lines (whinh2120m000) session for outbound order lines for transfer orders with order origin JSC Production.
Note: The setting of this check box is not relevant for the issue of materials to the job shop, only for transfer to a job shop warehouse. For warehousing orders with order origin JSC Production and transaction type Issue, LN always creates a back order in case of material shortage, regardless the setting of this parameter. - Move Allocation to Shop Floor Warehouse
-
If you are using job shop warehouses, the current parameter determines when the materials are moved to the job shop warehouse.
During production order generation, material is allocated from a warehouse:
- If the Use of Shop Floor Warehouses check box is selected, this is a job shop warehouse, and the current parameter applies.
- If the Use of Shop Floor Warehouses check box is cleared, the current parameter does not apply. Material is allocated from the warehouse that is specified in the Estimated Materials (ticst0101m000) session. The default warehouse for this is usually the one that is maintained in the BOM.
The allocated materials are the components specified in the BOM.
Allowed values
- At Planning
-
-
When EP Planned Production Order is created
The allocations are made on Shop Floor Warehouse -
When Shop Floor Production Order is created
The allocations are made on Shop Floor Warehouse
-
- At Generation
-
-
When EP Planned Production Order is created
The allocations are made on BOM Warehouse -
When Shop Floor Production Order is created
The allocations are made on Shop Floor Warehouse
-
- At Release
-
-
When EP Planned Production Order is created
The allocations are made on BOM Warehouse -
When Shop Floor Production Order is created
The allocations are made on BOM Warehouse. They will be transferred to Shop Floor Warehouse at the time of release of production order
-
- Not Applicable
-
Shop floor warehouses are not in use.
- Update Method Allocated and Issued Quantities
-
When the quantity planned input of an operation is adjusted, this parameter determines what happens to the Net Quantity, To Issue and Subsequent Delivery fields of the materials linked to these operations.
This refers to:
- Material allocations.
- Materials that have already been issued.
Note:- The materials quantities that have already been issued are displayed in the Actual Quantity field in the Estimated vs. Actual Material Costs (ticst0501m000) session.
- This parameter only affects materials for quantity-dependent materials.
- This parameter does not affect cost items.
Allowed values
- Allocations and Return Bookings
-
The reduction of the allocation can exceed the sum of the quantity in the Subsequent Delivery field and the quantity in the To Issue field. In this case, the Subsequent Delivery field is set to zero, and the value of the To Issue field becomes negative. The negative quantity in the To Issue field means that this quantity is posted back to inventory. The value of the Actual Quantity field is reduced by the same quantity.
- Only Allocations
-
The allocation of material is reduced. The Subsequent Delivery field and the To Issue field in the Material to Issue for Production Orders (ticst0101m100) session are reduced by the same quantity. The Subsequent Delivery field and the To Issue field can be reduced to zero but cannot become negative. This condition also limits the reduction of the allocations. Any issued quantities remain unchanged.
Note: While calculating this reduction, the sum of the To Issue field, the Subsequent Delivery field, and the Actual Quantity field is assumed to match the operation's quantity-planned input. - Nothing
-
The allocations and issued quantities are not affected in any way, not even when the Quantity Ordered field is changed for Created production orders without regenerating the orders ( Update Method in the Production Order (tisfc0101s000) details session is No Action or Recalculate).
- Automatic Select Alternatives
-
This field determines at which moments LN checks for use-up materials and alternative materials.
Allowed values
-
At Generation
LN checks for alternatives when a production order is generated. -
At Release
LN checks for alternatives when you release a production order. -
No Automatic Replacement
LN does not check for alternatives automatically. You can still manually initiate a check for alternatives.
Note: This functionality is available only if the Alternative Materials check box is selected in the Implemented Software Components (tccom0100s000) session. -
- Check Material Shortages at Release
-
If this check box is selected, the Release Production Orders (tisfc0204m000) session offers the option to release only production orders for which no material shortages exist.
- Hours Settings
-
- Update Method for Estimated Hours
-
The way in which the estimated hours are updated when the planning is modified.
Allowed values
- Automatic
-
When the planning is modified, the cost estimate is automatically updated.
- Interactive
-
When the planning is modified, you are asked whether the cost estimate must be updated accordingly.
- None
-
The cost estimate is not changed.
- Split Hours in Setup and Production
-
If this check box is selected, the estimated and actual hours of an operation are split up.
The estimated and actual hours of an operation can be split up in setup time hours and cycle time hours. This results in a setup part and a production part for the estimated and the actual man and machine hours as can be viewed in, for example, Estimated vs. Actual Hours Costs (ticst0502m000) session.
The Split Hours in Setup and Production check box is introduced in the Production Orders (tisfc0501m000) details session and the Default Production Order Data (tisfc0102m000) session to determine whether the hours must be split up.
Note: Selecting this check box can impact system performance negatively if the Backflush Hours check box in the Item - Production (tiipd0101m000) session is selected.
- Backflushing
-
- Backflushing Method
-
The value of this field determines the degree of user interaction when backflushing is carried out.
Allowed values
- Automatic
- Manual
- Interactive
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Backflushing method.
- Backflushing without Warehouse Orders
-
If this check box is selected, no warehousing orders are created for backflushed material.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Backflushing without warehouse orders.
- Labor Type
-
The labor type that is used by LN in non-assembly work centers, if the hours are accounted by backflushing.
- Device for Processing Backflushed Hours
-
The output device for printing the backflushed hours.
Allowed values
The device must have been defined in the Device Data (ttaad3500m000) session.
- -
-
The name of the output device for printing the backflushed hours.
Allowed values
The device must have been defined in the Device Data (ttaad3500m000) session.
- Device for Issuing Backflushed Materials
-
The output device for printing the backflushed materials. LN also uses this device to print shortage lists.
Allowed values
The device must have been defined in the Device Data (ttaad3500m000) session.
- -
-
The name of the output device for printing the backflushed materials.
Allowed values
The device must have been defined in the Device Data (ttaad3500m000) session.
LN also uses this device to print shortage lists.
- Documents
-
- Printing Production Order Documents Mandatory
-
If this check box is selected, production orders cannot be released before the order documents have been printed.
Note: This parameter does not apply to production orders for repetitive or FAS items.Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Printing of documents.
- Order Covering Note
-
If this check box is selected, the covering note is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Routing Sheet
-
If this check box is selected, the routing sheet is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Operation Note
-
If this check box is selected, the operation note is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Cutting List
-
If this check box is selected, a cutting list is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Material List
-
If this check box is selected, the material list is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Collective Sawing List
-
If this check box is selected, the collective sawing list is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Collective Cutting List
-
If this check box is selected, the collective cutting list is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Material Issue Note
-
If this check box is selected, the material issue note is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Receipt Note
-
If this check box is selected, the receipt note is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Subcontracting Note
-
If this check box is selected, the subcontracting note is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Inspection Note
-
If this check box is selected, the inspection note is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Check List
-
If this check box is selected, the checklist is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Sawing List
-
If this check box is selected, the sawing list is printed.
This check box indicates the default for the corresponding check box in the Print Production Order Documents (tisfc0408m000) session.
- Copy Document Links from Instructions
-
In the Routing module, you can define a microrouting. You can link documents to instructions in the microrouting by using ODM package.
If this check box is selected, the documents that are linked to instructions in the Routing module are also available in Job Shop Control .
- History
-
- Version Control
-
If this check box is selected, production orders are version controlled.
Note:These parameters must be selected for version control:
- Log Production Orders
- Log Materials and Operation Costs
- Log Production Orders
-
If this check box is selected, changes in production orders are logged.
Note: Must be checked for project pegging to be implemented. - Log Materials and Operation Costs
-
If this check box is selected, material distribution and operational costs is logged.
Note: Must be checked for project pegging to be implemented.
- Costing
-
- General
-
- Financial Transactions by Work Center
-
If this check box is selected, you can view the production results by work center. The material costs and the hours costs are posted to the work center to which these costs apply.
If this check box is cleared, you can view the production results by production order. The surcharges, as well as the material costs and the hours costs, are posted to the production order's calculation office.
Note: The calculation office currency is also used for production orders that have no operations and work centers, but only materials.Currencies
When you calculate the estimated costs, and a Dependent currency system is used, the Financial Transactions by Work Center check box also determines the currency that is used:
- If this check box is selected, the local currency of the costing work center for which the costs are calculated is used.
- If this check box is cleared, the currency of the calculation office is used.
Estimated end item unit costs
- Item-based Costs
-
The end-item costs are stored for the item's effective cost component structure at the production order's calculation office
- Work Center-based Costs
-
The end-item costs are stored on the detailed cost components per work center. So, if more than one work center is used for a production order, costs are specified for every work center seperately.
Item-based and work center-based end-item unit costs can be viewed in the End Item Unit Costs (ticst0510m000) session.
Financial transactions by work center Work center based costs Item based costs No 1 2 Yes 3 4 1: The total end item unit costs are posted for each work center by detailed cost component. The only work center available is the calculation office. The costs are expressed in the calculation office's currency.
2: The total end item unit costs are posted for the calculation office by the item's effective cost component structure. The costs are expressed in the calculation office's currency.
3: The total end item unit costs are posted for a costing work center or a calculation office by detailed cost component. The costs on a work center include operation costs and material costs. The costs on the calculation office include (added) end item surcharges and the costs for unlinked materials. The costs are expressed in the local currency of the costing work center.
4: The total end item unit costs are posted for the calculation office by the item's effective cost component structure. The costs are expressed in the calculation office's currency.
Note: You can view the end item unit costs, work center-based as well as item-based, in the End Item Unit Costs (ticst0510m000) session.WIP transfers
If the Financial Transactions by Work Center check box is cleared, WIP transfers are not calculated. Because the production results are viewed by production order, the costs are posted on the production order's calculation office, and no costs are posted on the work centers. Consequently, there is no need to calculate WIP transfers between different work centers.
Calculating efficiency/price variances
If a production order is closed, the Financial Transactions by Work Center check box determines on which level efficiency variances and price variances are calculated. The posting, however, depends on the posting methods that are defined in the following fields:
- Posting Method Efficiency Variances on Calculation Office
- Posting Method Price Variances to Calculation Office
- Posting Method Efficiency Variances on Calculation Office
- Posting Method Price Variances to Calculation Office
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Financial transactions by work center.
- Transfer WIP method
-
The moment when a WIP transfer takes place.
Allowed values
- Always
-
When a quantity is reported as complete, and the delivering work center is different from the receiving work center, the transfer is performed.
- Only upon Completion
-
When the operation is reported as complete, and the delivering work center is different from the receiving work center, the transfer is performed.
- Not Implemented
-
WIP transfers are never carried out.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Transfer WIP method.
- Process Hours using
-
To process hours for a production order, labor costs are calculated. To calculate the labor cost, either Estimated Operation Rates or Actual Labor Rates are used.
Allowed values
- Estimated Operation Rates
-
To calculate labor costs, the operation rates defined in the Standard Cost Calculation module are used. The operation rates belong to the work center to the which the hours are posted.
- Actual Man and Machine Rates
-
To calculate labor costs, the employee's hourly labor rate and the machine rate are used.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Actual operation rates.
- Moment of Completion Posting
-
The moment when LN posts the financial transactions for the completed quantities to Financials .
This field can have the following values:
-
Quantity Completed
Every time you report a quantity of the main item completed, LN posts the corresponding financial transactions. -
Order Status Completed
When the production order status is set to Completed, LN posts the corresponding financial transactions.
Note: To limit the number of postings and obtain the best performance, it is recommended to set this field to Order Status Completed, unless you require more frequent posting of transactions.This field is defaulted to the Moment of Completion Posting field in the Production Orders (tisfc0501m000) session. You can change the field in that session for a specific production order until the production order status is set to Released.
-
- Calculation Office defined in
-
Select at what level the calculation office is defined.
Allowed values
- Default Production Order Data
-
By default, the costs are booked to the calculation office linked to the order series of the production order.
- Prepare for Production Department
-
Costs for existing production orders are booked to the calculation office linked to the order series of the production order. You can setup the data required to book costs to the production department calculation office.
If operations are still present on the selected production order when the option is selected, the calculation office is defined based on the production department the last operation is linked to.
- Production Department
-
By default, the costs are booked to the calculation office linked to the production department of the last operation.
- Fallback Calculation Office
-
If no routing is defined for the selected production order, the calculation office specified in this field is used. The work center must be of the type Costing.
Note: This check box applicable only if the Calculation Office defined in has Production Department selected.
- Calculation of Variances
-
- Posting Method Efficiency Variances on Calculation Office
-
If the Financial Transactions by Work Center check box is cleared, you can use this field to determine to which financial company the efficiency variances are posted.
Note: The financial company is determined by the enterprise unit to which a calculation office or work center belongs. Calculation offices and work centers are defined as departments, which establish the link with the enterprise unit.Allowed values
- Not Applicable
-
Information on price variances or efficiency variances is not retained for financial reporting. Calculation office variances are posted to the calculation office involved.
- On Production Order
-
The financial transactions relating to price variances or efficiency variances are posted to the production order's calculation office.
- On Work Center
-
The financial transactions relating to price variances are posted to the work center's financial company. This action is only possible if the results are calculated by work center.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Posting method for efficiency variances.
- Posting Method Price Variances to Calculation Office
-
If the Financial Transactions by Work Center check box is cleared, you can use this field to determine to which financial company the price variances are posted.
Note: The financial company is determined by the enterprise unit to which a calculation office or work center belongs. Calculation offices and work centers are defined as departments, which establish the link with the enterprise unit.Allowed values
- Not Applicable
-
Information on price variances or efficiency variances is not retained for financial reporting. Calculation office variances are posted to the calculation office involved.
- On Production Order
-
The financial transactions relating to price variances or efficiency variances are posted to the production order's calculation office.
- On Work Center
-
The financial transactions relating to price variances are posted to the work center's financial company. This action is only possible if the results are calculated by work center.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Posting method for price variances.
- Posting Method Efficiency Variances on Calculation Office
-
If the Financial Transactions by Work Center check box is selected, you can use this field to determine to which financial company the efficiency variances are posted.
Note: The financial company is determined by the enterprise unit to which a calculation office or work center belongs. Calculation offices and work centers are defined as departments, which establish the link with the enterprise unit.Allowed values
- Not Applicable
-
Information on price variances or efficiency variances is not retained for financial reporting. Calculation office variances are posted to the calculation office involved.
- On Production Order
-
The financial transactions relating to price variances or efficiency variances are posted to the production order's calculation office.
- On Work Center
-
The financial transactions relating to price variances are posted to the work center's financial company. This action is only possible if the results are calculated by work center.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Posting method for efficiency variances.
- Posting Method Price Variances to Calculation Office
-
If the Financial Transactions by Work Center check box is selected, you can use this field to determine to which to which financial company the price variances are posted.
Note: The financial company is determined by the enterprise unit to which a calculation office or work center belongs. Calculation offices and work centers are defined as departments, which establish the link with the enterprise unit.Allowed values
- Not Applicable
-
Information on price variances or efficiency variances is not retained for financial reporting. Calculation office variances are posted to the calculation office involved.
- On Production Order
-
The financial transactions relating to price variances or efficiency variances are posted to the production order's calculation office.
- On Work Center
-
The financial transactions relating to price variances are posted to the work center's financial company. This action is only possible if the results are calculated by work center.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to Posting method for price variances.
- Use Actual Valuation for
-
- End Item Receipt Posting
-
If this check box is selected, end items are received in inventory at their actual costs, and valued according to the defined actual valuation method.
Note: Calculation-office variances can occur for JSC orders with project pegs if planned project pegs deviate from the actual project pegs of the end item. These variances cannot be attributed to price or efficiency.If this check box is cleared, FTP inventory valuation method is used.
Performance aspects
The setting of this field could affect system performance and database growth..
- Subassembly Receipt Posting
-
If this check box is selected, subassemblies are received in inventory at their actual costs. These are determined by aggregating the costs incurred during subassembly.
Note: If the Subcontracting with Material Flow check box is cleared, you cannot select this option.If this check box is cleared, the subassemblies are received in inventory based on estimated costs.
- WIP Transfers and Completions
-
If this check box is selected, the financial transactions of the type WIP Transfer Issue, WIP Transfer Receipt and Completion are logged against actual costs.
- Miscellaneous
-
- Moment of Generating Serial Numbers
-
The moment when serial numbers are created for serialized items. Using a mask is mandatory if you generate serial numbers, otherwise generation will fail.
Allowed values
- On Completion
-
The serial numbers for end items are generated in the Serial End Item - As-Built Headers (timfc0110m000) session when you report the production order completed.
- On Printing Documents
-
The serial numbers for end items are generated in the Serial End Item - As-Built Headers (timfc0110m000) session when you print the production order documents.
- On Release
-
The serial numbers for end items are generated in the Serial End Item - As-Built Headers (timfc0110m000) session when you release the production order.
- Manually
-
Serial numbers are not generated at a fixed moment in the production proces. The serial numbers are generated at a moment in the production process determined by the user. To generate serial numbers, start the Serial End Item - As-Built Headers (timfc0110m000) session, and click in the appropriate menu. You can also enter serial numbers manually in the Serial Number field.
- As-Built Status Handling
-
The way how statuses of serialized end items are handled in the Serial End Item - As-Built Headers (timfc0110m000) session.
Allowed values
- Automatic
-
The status handling of serialized items in the Serial End Item - As-Built Headers (timfc0110m000) session is carried out automatically by LN.
- Manual
-
The status handling of serialized items in the Serial End Item - As-Built Headers (timfc0110m000) session must be carried out manually by the end user.
- Only Serialized and Lot Controlled Items in As-Built Components
-
If this check box is selected, only serialized items and lot-controlled items are displayed in the Serial End Item - As-Built Components (timfc0111m000) session.
If this check box is cleared, non-serialized items and non lot-controlled items are also displayed in the Serial End Item - As-Built Components (timfc0111m000) session.
Performance aspects
The setting of this field could affect system performance and database growth. For more information, refer to As-Built components with serialized and lot controlled items.
- Subcontracting
-
- Production Order Reference on Subassemblies
-
If this check box is selected, the production order the subassembly belongs to is referenced during subcontracting.
- Block Order Release when Requisition Mandatory
-
If this check box is selected, you cannot release a production order that includes a subcontracting operation for which a Purchase requisitions is not yet generated.
Note:Generation of a requisition for a subcontracted operation is mandatory if one of the following is applicable:
- No subcontractor is specified for the subcontracting operation
- The Requisition Mandatory for Operation Subcontracting check box is selected in the Items - Purchase (tdipu0101m000) session for the subcontracted service item that is used for the subcontracting purchase requisition
- Blocking Reason for Automatic Blocking
-
The reason for automatically blocking a subcontracted operation of a production order for which a purchase requisition is generated.
When the purchase requisition is converted into a purchase order, the subcontracting operation is automatically unblocked.
- Project Pegging
-
- Freeze Material and Operation Pegs
-
If this check box is selected, material supply to the operation pegs is frozen.
- Split Production Order
-
- Allow Production Order Splits
-
If this check box is selected, parts of production orders can be split off into new production orders.
- Print Order Documents At Order Split
-
If this check box is selected, the Print Production Order Documents (tisfc0408m000) is automatically started when an order is split.
Note: Before you can select this check box, the Printing Production Order Documents Mandatory check box must be selected in this session. - Reason Code for Order Split
-
Select whether or not a reason code must be specified during order split.
-
Never
No reason code is required. -
Optional
You can optionally specify a reason code. -
Mandatory
You must specify a reason code.
Note: Only applies if the Log Production Orders and Allow Production Order Splits check boxes are selected in the current session. -
- Split Order when Reporting Rejected Quantity
-
If this check box is selected, a rejected quantity on an operation or production order can be split off instead of rejected.
If this check box is selected, and a rejected quantity is specified in the Report Operations Completed (tisfc0130m000) or a quantity to scrap is specified in the Report Orders Completed (tisfc0520m000) sessions, you will be asked if the rejected quantity must be split off. If you click Yes, the Split Production Order (tisfc0208m000) session is started in which you can specify the quantity to be split off.
Note: If the Quarantine Inventory check box is selected in the Inventory Handling Parameters (whinh0100m000) session, it is not possible to spilt off orders in the Report Orders Completed (tisfc0520m000) session. Furthermore, you will not be asked to confirm that you want to split off the rejected quantity in the Report Operations Completed (tisfc0130m000) session.Default value
If the Split Order when Reporting Rejected Quantity check box is selected, the rejected quantity is the default quantity to be split off.
- Actual Material Costs breakdown for Transfer Postings
-
Select the aggregation level of the actual materials costs at transfer.
Allowed values
- By Operation Only
-
All actual material costs are aggregated to the operation level before transfer. This lowers the amount of transactions.
Note: If this parameter is selected, price variance per material cannot be calculated properly. - By Operation and Material Position
-
All actual material costs are transferred separately.
Note: If this parameter is selected, the amount of transactions logged will increase, especially when an operation requires many material components.
- Job Shop and Manufacturing Executing System
-
- MES Reporting
-
If this check box is selected, the MES Reporting for Job Shop integration has been implemented in the Implemented Software Components (tccom0100s000) session.
Note: This parameter sets the defaults for the selected site.
- Audit
-
- Reason Codes
-
- Production Rework Orders
-
If this check box is selected, a reason code must be entered for any rework on production orders to be done.
- Implementation
-
- Infor SCM Scheduler
-
If this check box is selected, the Infor SCM Scheduler has been implemented in the Implemented Software Components (tccom0100s000) session.
- Transfer Items without Production Orders
-
If this check box is selected, items can be transferred to a warehouse without a transfer order being present.