Report Shift (tirpt4636m200)
Use this session to report when a shift is completed. The reported production quantities, hours spent and materials used must be checked and corrected if required , before the shift can be reported complete. The shifts must be reported complete for each work cell. LN does not allow you to update this data , after the work cell shift status is set to Completed. However, the shift must be reopened first.
This session can also be used by the supervisor to track progress, or view the status of a work cell.
If the Automatic Labor Hours and Automatic Work Cell Hours parameters are active in:
- Repetitive Manufacturing Parameters (tirpt0100m000)
- Production Settings by Site (timfc0180m000)
- Repetitive Settings History by Site (tirpt0181m000)
Actual hours are approved automatically one a shift is reported complete in the Report Shift (tirpt4636m200) session.
Field Information
- Shift
-
- Site
-
The site ID.
Note: Only visible if multisite functionality is active. - Work Cell
-
The work cell code.
- Shift
-
The unique ID for the shift.
- Date
-
The date and time when the specified shift starts.
- Start
-
The date and time when the specified shift starts.
- End
-
The date and time when the specified shift concludes.
- Status
-
- Shift
-
The shift status.
Allowed values
- Open
-
The shift is still in progress, work is being done on the work list in the Work List (tirpt4602m000) session.
- Completed
-
The shift has ended.
- Closed
-
The shift has ended, backflushing has taken place and cost documents are closed.
- Work
-
The type of work taking place.
Allowed values
- Set Up
- Run
- Down
- Wait
- Supervisor
-
The code of the supervisor who can manage one or more work cells, and is responsible for reporting on these work cells.
- Change Date
-
The date the last status change took place.
- Work Cell Hours
-
- Estimated
-
The estimated time (in hours) calculated for this shift in the specified work cell. LN defaults the values based on the shift data in the Shift - Hours (tirpt4138m000) session.
- Registered
-
The time (in hours) registered to complete a shift in the specified work cell. The time is categorized as run, setup, down and wait time.
- Actual
-
The actual time (in hours) for this shift in the specified work cell. LN defaults the value to the registered hours. This can be corrected by the supervisor.
Note:The Automatic Work Cell Hours parameter must be selected in the Production Settings by Site (timfc0180m000), or, if Sites is not active, in the Repetitive Manufacturing Parameters (tirpt0100m000) sessions for the actual hours to be approved automatically once the shift is reported completed.
The backflushing calculation is based on the produced and rejected quantities.
- Labor Hours
-
- Estimated
-
The estimated labor hours of all workers for this shift.
- Registered
-
The labor hours registered for this shift.
- Materials
-
The actual labor hours for this shift. LN defaults the value to the registered hours. This can be corrected by the supervisor.
Note: The Automatic Labor Hours parameter must be selected in the Production Settings by Site (timfc0180m000), or, if Sites is not active, in the Repetitive Manufacturing Parameters (tirpt0100m000) sessions for the actual hours to be approved automatically once the shift is reported completed.
- Units Completed
-
The estimated produced quantity for this shift.
- Registered Total Produced
-
The registered produced quantity for this shift.