Backflush Schedule Line Materials (tirpt4221m100)

Use this session to manage the issuing of backflush schedule line materials.

Note: Blackflushing is done on reporting end items complete, at the closing of a shift, the closing of a work cell cost document or manually done.

Field Information

Site

The site ID.

Note: Only visible if multisite functionality is active.

Production Schedule

production schedule

Schedule Position

The material's position in the production schedule.

Work Cell

work cell

To Date/Time

The date and time to which schedule line materials are issued.

Backflush Sequence

The sequence in which LN backflushes materials for schedule lines.