Initiate Schedule Line Material Issue (tirpt4221m000)

Use this session to manage the issue of non-backflush schedule line material.

Note: Use the Backflush Schedule Line Materials (tirpt4221m100) to manage blackflush schedule line materials.

Field Information

Site

The site ID.

Note: Only visible if multisite functionality is active.

Production Schedule

production schedule

Schedule Position

The material's position in the production schedule.

Work Cell

work cell

To Date/Time

The date and time to which schedule line materials are issued.

Issue Sequence

The sequence in which the materials are issued.