Work Cell and Shift - Products (tirpt4137m000)

Use this session to report end items completed per work cell and shift.

Field Information

Work Cell

The work cell ID.

Date

The date and day of the specified shift.

Shift

The shift ID.

# Labor Resources

The number of operators required for production.

End Date

The end date of the period in which the order delivery dates fall.

Order Status

The shift status.

Allowed values

Open

The shift is still in progress, work is being done on the work list in the Work List (tirpt4602m000) session.

Completed

The shift has ended.

Closed

The shift has ended, backflushing has taken place and cost documents are closed.

Schedule Line

The schedule ID and the line position.

Status

Production line status.

Allowed values

Free

Run schedule is controlled by the planning engine.

Firm
  • The production schedule lines with the status Firm can be replanned only by using the Move Schedule (tirpt4202m000) session and not by the Enterprise Planning or other planning engines.
  • Production Schedule Lines with a status of Firm can be locked from replanning or moving by planning engines such as Enterprise Planning.
Released

Run schedule complete, changes can only be made manually.

Active

Production run schedule is being implemented.

Production Completed

All schedule lines for the production run were completed, but the run has not been closed.

Completed

All schedule lines for the production run were completed, and all completed products were delivered into inventory. You can still account hours and issue materials for the run schedule.

Closed

The run schedule was completed, changes can no longer be made.

Production Start Date

The date and time production for the schedule line started.

Product

The ID of the manufactured item.

Completed

The quantity product reported Completed.

To Quarantine
The quantity of the product that is quarantined during the specified shift.
Repaired
The quantity product returned to the schedule line from the repair cell.
Scrapped

The quantity product scrapped.

Rejected

The quantity product rejected during production. You must decide if the quantity is scrapped, moved to quarantine or to a repair cell.

To Repair

The quantity product transferred to a repair cell.