Production Schedule Lines (tirpt4102m000)

Use this session to view and manage production planning.

Note: Production Schedule Lines with status Firm can be:
  • Reset into a status Free using the Production Schedule Lines (tirpt4102m000) session.
  • Locked from being replanned or moved by the planing engineMove Schedule (tirpt4202m000) session.

Field Information

Site

The site ID.

Note: Only visible if multisite functionality is active.

Production Schedule

The ID of the schedule.

Line

The line's position in the schedule.

Item

The item that is reported on.

Note: If the schedule is multi-product, the tool that drives production is specified.
Work Cell

work cell

Quantity Ordered

The quantity to be produced for this schedule line.

Start Date

The planned start date for the production of the item.

Finish Date

The planned finish date for the production of the item.

Quantity Completed

The quantity that is already been completed.

Quantity to Backflush

The quantity for which backflushing was not yet completed.

Quantity Backflushed

The produced quantity for which materials are backflushed.

Quantity Rejected

The quantity product rejected during production. You must decide if the quantity is scrapped, moved to quarantine or to a repair cell.

Quantity Scrapped

The quantity product scrapped during production.

Quantity to Quarantine

The quantity quarantined during production.

Quantity to Repair

The quantity to be repaired.

Quantity Repaired

The quantity already repaired and returned.

Original Start Date

The earliest date materials to manufacture the item are available.

Original Finish Date

The earliest date the planned quantity can be completed.

Actual Production Start Date

The date production started.

Actual Production Finish Date

The date production was finished.

Status

Production line status.

Allowed values

Free

Run schedule is controlled by the planning engine.

Firm
  • The production schedule lines with the status Firm can be replanned only by using the Move Schedule (tirpt4202m000) session and not by the Enterprise Planning or other planning engines.
  • Production Schedule Lines with a status of Firm can be locked from replanning or moving by planning engines such as Enterprise Planning.
Released

Run schedule complete, changes can only be made manually.

Active

Production run schedule is being implemented.

Production Completed

All schedule lines for the production run were completed, but the run has not been closed.

Completed

All schedule lines for the production run were completed, and all completed products were delivered into inventory. You can still account hours and issue materials for the run schedule.

Closed

The run schedule was completed, changes can no longer be made.

Origin

View the origin of the production run schedule.

Allowed values

Planning

The production run is scheduled using Enterprise Planning .

Manual

The production run is scheduled manually.

Warehousing Order

warehousing order