Production Schedule Lines (tirpt4102m000)
Use this session to view and manage production planning.
- Reset into a status Free using the Production Schedule Lines (tirpt4102m000) session.
- Locked from being replanned or moved by the planing engineMove Schedule (tirpt4202m000) session.
Field Information
- Site
-
The site ID.
Note: Only visible if multisite functionality is active. - Production Schedule
-
The ID of the schedule.
- Line
-
The line's position in the schedule.
- Item
-
The item that is reported on.
Note: If the schedule is multi-product, the tool that drives production is specified. - Work Cell
- Quantity Ordered
-
The quantity to be produced for this schedule line.
- Start Date
-
The planned start date for the production of the item.
- Finish Date
-
The planned finish date for the production of the item.
- Quantity Completed
-
The quantity that is already been completed.
- Quantity to Backflush
-
The quantity for which backflushing was not yet completed.
- Quantity Backflushed
-
The produced quantity for which materials are backflushed.
- Quantity Rejected
-
The quantity product rejected during production. You must decide if the quantity is scrapped, moved to quarantine or to a repair cell.
- Quantity Scrapped
-
The quantity product scrapped during production.
- Quantity to Quarantine
-
The quantity quarantined during production.
- Quantity to Repair
-
The quantity to be repaired.
- Quantity Repaired
-
The quantity already repaired and returned.
- Original Start Date
-
The earliest date materials to manufacture the item are available.
- Original Finish Date
-
The earliest date the planned quantity can be completed.
- Actual Production Start Date
-
The date production started.
- Actual Production Finish Date
-
The date production was finished.
- Status
-
Production line status.
Allowed values
- Free
-
Run schedule is controlled by the planning engine.
- Firm
-
- The production schedule lines with the status Firm can be replanned only by using the Move Schedule (tirpt4202m000) session and not by the Enterprise Planning or other planning engines.
- Production Schedule Lines with a status of Firm can be locked from replanning or moving by planning engines such as Enterprise Planning.
- Released
-
Run schedule complete, changes can only be made manually.
- Active
-
Production run schedule is being implemented.
- Production Completed
-
All schedule lines for the production run were completed, but the run has not been closed.
- Completed
-
All schedule lines for the production run were completed, and all completed products were delivered into inventory. You can still account hours and issue materials for the run schedule.
- Closed
-
The run schedule was completed, changes can no longer be made.
- Origin
-
View the origin of the production run schedule.
Allowed values
- Planning
-
The production run is scheduled using Enterprise Planning .
- Manual
-
The production run is scheduled manually.
- Warehousing Order