Operation Cost Analysis (tirou4101m100)

Use this session to display the calculated operation costs by routing operation, along with the level at which the retrieved rates are defined.

Field Information

Product

The product ID.

Site

The site for which the routing is defined.

Routing

routing

Revision

The routing revision to which the related routing operation applies.

Reference Date

The date used to retrieve the date effective, approved operation rates used in the calculations.

Cost Calculation Code

cost calculation code

Order Quantity

The amount of product to be purchased or manufactured at one time. In case of a customized item, the total required quantity as specified in the project structure.

Status

The status of the routing.

Operation Rate Currency

The currency automatically selected for the specified rates for the site.

Effective Date

The date he routing revision becomes effective.

Expiry Date

The date the routing revision expires.

Operation

The operation ID.

Reference Operation

The ID of the task performed on the manufacturing machine.

Machine Type

The sort of machine that is used during production.

Number of Machines

The number of machines used during production.

Labor Resources for Production (FTE)

The number of man hours needed for production.

Labor Resources for Setup (FTE)

The number of man hours needed to setup for production.

Work Center

work center

Setup (h)

The operation setup time in hours.

Run (h)

The operation cycle time in hours, multiplied by the quantity in the Order Quantity field.